My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4101-25
>
Ordinances
>
Ordinance 4101-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 3:28:15 PM
Creation date
6/24/2025 3:16:06 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4101-25
Date
6/18/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EVERETT 2044 <br />COMPREHENSIVE PLAN <br /> <br /> <br /> <br /> 6/17/2025 <br />COMPREHENSIVE PLAN <br />TRANSPORTATION ELEMENT <br /> Page 116 <br />BICYCLE PROJECTS <br />PROJECT ID PROJECT NAME DESCRIPTION MODE COST 1 <br />T2-B 12th Street bicycle <br />facility <br />Add a bicycle lane to the existing <br />roadway, Tier 2 project in BMP Bicycle $56,000 <br />T2-K <br />Grand Avenue bicycle <br />facility (Alverson - <br />35th) <br />Add a bicycle boulevard. to the <br />existing roadway, Tier 2 project in <br />BMP <br />Bicycle $26,000 <br />T3-A S 2nd Avenue bicycle <br />facility <br />Add a bicycle lane to the existing <br />roadway, Tier 3 project in BMP Bicycle $25,000 <br />T3-B S 3rd Avenue bicycle <br />facility <br />Add a bicycle lane to the existing <br />roadway, Tier 3 project in BMP Bicycle $25,000 <br />T1-A1 35th Street bicycle <br />facility <br />New Bike boulevard, Tier 1 project <br />in BMP Bicycle 42,000 <br />T1-F7 College Ave (North) <br />bicycle facility <br />Add a Bike Boulevard to the existing <br />roadway, Tier 1 project in BMP Bicycle 39,000 <br />T1-H2 Lombard Avenue <br />bicycle facility North <br />Add a bicycle boulevard. to the <br />existing roadway, Tier 1 project in <br />BMP <br />Bicycle 192,100 <br />T1-J4 Fulton St 2 bicycle <br />facility (North) <br />Add a Bike Boulevard to the existing <br />roadway, Tier 1 project in BMP Bicycle 22,000 <br />T2-A <br />Sievers -Duecy <br />Boulevard bicycle <br />facility <br />Add a bicycle lane to the existing <br />roadway, Tier 2 project in BMP Bicycle 132,000 <br />T2-DD Railway Avenue bicycle <br />facility <br />Add a bicycle boulevard to the <br />existing roadway, Tier 2 project in <br />BMP <br />Bicycle 127,000 <br />T2-G 10th Street bicycle <br />facility <br />Add a bicycle lane to the existing <br />roadway, Tier 2 project in BMP Bicycle 685,000 <br />T2-J Larimer Road bicycle <br />facility <br />Add a bicycle lane to the existing <br />roadway, Tier 2 project in BMP Bicycle 6,110,000 <br />T2-Q Norton Ave bicycle <br />facility <br />Add a Bicycle Lane to the existing <br />roadway, Tier 2 project in BMP Bicycle 86,000 <br />T2-S 43rd St SE bicycle <br />facility <br />Add a Bike Boulevard to the existing <br />roadway, Tier 2 project in BMP Bicycle 86,000 <br />T3-E Silver Lake Road <br />bicycle facility <br />Add a bicycle lane to the existing <br />roadway, Tier 3 project in BMP Bicycle 28,000 <br />T3-I Olympic Boulevard <br />bicycle facility <br />Add a bicycle lane to the existing <br />roadway, Tier 3 project in VMP Bicycle 31,000 <br />T3-J Beverly Boulevard <br />bicycle facility <br />Add a bicycle lane to the existing <br />roadway, Tier 3 project in BMP Bicycle 2,464,000
The URL can be used to link to this page
Your browser does not support the video tag.