My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Darkhorse Emergency LP 6/18/2025
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Darkhorse Emergency LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2025 9:57:42 AM
Creation date
6/25/2025 9:50:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Darkhorse Emergency LP
Approval Date
6/18/2025
End Date
12/31/2026
Department
Finance
Department Project Manager
Bert Cueva
Subject / Project Title
Community Risk Assessment & Standards of Cover
Tracking Number
0004862
Total Compensation
$114,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Phase 3: Final Deliverables & Documentation (Weeks 9-12) <br />Crystallize analysis into clear, actionable recommendations and <br />documentation that provide a roadmap for immediate and <br />long-term improvements. <br />● Finalize the Community Risk Assessment and Standards of Cover reports <br />● Prepare all required GIS shapefiles and technical data exports <br />● Deliver executive presentations to City leadership <br />● Provide implementation guidance for priority recommendations <br />Project Management Approach <br />We maintain tight project control through: <br />● Biweekly project status updates with the designated EFD point of <br />contact <br />● Monthly milestone reviews with the project steering committee <br />● Clear documentation of all key decisions and action items <br />● Rigorous version control of all deliverables <br />● A dedicated project manager who serves as your single point of contact <br />throughout <br />Our methodology emphasizes collaboration and transparency, ensuring that <br />EFD leadership remains fully informed and engaged throughout the process. <br />The final deliverables will provide a clear roadmap for optimizing deployment <br />strategies based on Everett's specific community risk profile and operational <br />capabilities. <br /> <br />Ongoing Analytical Support <br />A large problem with Community Risk Assessment and Standards <br />of Covers projects and other consulting projects of this time span <br />is the timing of the analysis. The project revolves around gathering <br />broad data from different sources. Oftentimes, the final report is <br />out of date by the time it is finalized. <br />27
The URL can be used to link to this page
Your browser does not support the video tag.