Laserfiche WebLink
Page 4 of 11State of Washington Department of Ecology <br />City of Everett <br />100th St. SW Regional Stormwater Facility Study Project <br />Agreement No. WQC-2022-EverPW-00084 <br />on the draft State Environmental Policy Act (SEPA) documents. <br />B.The RECIPIENT will notify the ECOLOGY project manager, in addition to the required distribution and public notice, <br />when SEPA documents have been issued for the official comment period , which is a minimum of 21 days. <br />C.The RECIPIENT is responsible for application of, receipt of, and compliance with all required local, state, tribal and <br />federal permits, licenses, easements, or property rights necessary for the project. <br />D.The RECIPIENT will submit the documents listed below to ECOLOGY to initiate cultural resources review . Property <br />acquisition and above and below ground activities proposed at any project site must be reviewed for potential affects to cultural <br />resources. <br /> 1.The RECIPIENT will submit the Cultural Resources Review Form to ECOLOGY, using the ECOLOGY template. Any <br />supporting materials must conform to the Department of Archeology and Historic Preservation’s Washington State Standards <br />for Cultural Resource Reporting. The Cultural Resources Review Form template may be found on the ECOLOGY website . <br /> 2.The RECIPIENT will submit an Inadvertent Discovery Plan (IDP) to ECOLOGY, using the ECOLOGY template. The <br />RECIPIENT will ensure that all contractors and subcontractors have a copy of the completed IDP prior to and while working <br />on-site. The IDP template may be found on the ECOLOGY website. <br />The RECIPIENT must receive written notice from ECOLOGY prior to proceeding with work . Examples of work may include <br />(but are not limited to) geotechnical work, acquisition, site prep work, and BMP installations. Work done prior to written <br />notice to proceed shall not be eligible for reimbursement. <br />Task Goal Statement: <br />The RECIPIENT will complete all cultural and environmental reviews and permitting tasks in a timely manner . <br />Task Expected Outcome: <br />The project will meet the requirements set forth by the cultural resource protection requirements, State Environmental Policy <br />Act, and all other applicable federal, state, and local laws, and regulations. <br />Deliverables <br />Due DateDescriptionNumber <br />2.1 SEPA checklist, or other documentation for projects considered exempt <br />from SEPA review. Upload to EAGL and notify ECOLOGY when <br />upload is complete. <br />2.2 List of permits acquired and environmental review documents. Upload to <br />EAGL and notify ECOLOGY when upload is complete . <br />Template Version 10/30/2015 <br />Docusign Envelope ID: 7C66725B-AA08-42E8-B48A-416E600A0A3C