My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Washington State Department of Ecology 7/2/2025 Amendment 1
>
Contracts
>
Agreement
>
Grant Agreement (City as Grantee)
>
Washington State Department of Ecology 7/2/2025 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 9:25:32 AM
Creation date
7/3/2025 9:25:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington State Department of Ecology
Approval Date
7/2/2025
Council Approval Date
6/25/2025
End Date
6/30/2026
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
100th St Regional Stormwater Facility Study - WQC-2022-EverPW-00084
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003493
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 5 of 11State of Washington Department of Ecology <br />City of Everett <br />100th St. SW Regional Stormwater Facility Study Project <br />Agreement No. WQC-2022-EverPW-00084 <br />2.3 Cultural Resources Review Form. Email the form and any supplemental <br />cultural resources documentation directly to the ECOLOGY Project <br />Manager. ECOLOGY will upload documentation to EAGL when <br />cultural resources is complete. <br />2.4 Inadvertent Discovery Plan. Upload to EAGL and notify ECOLOGY <br />when upload is complete. <br />CHANGES TO SCOPE OF WORK <br />Task Number:4 Task Cost: $32,000.00 <br />Task Title:Preliminary Design and Alternative Selection <br />Task Description: <br />The RECIPIENT will conduct a review of the available information and examine potential stormwater treatment and flow <br />control facilities that will serve both the existing developed areas and the future road improvements. <br />A. Using information collected in Data Collection task, the RECIPIENT shall prepare concept level design for potential flow <br />control and treatment facilities. Alternatives shall consider land use, contributing areas, property acquisition scenarios and <br />facility types. A comparative cost estimate shall be prepared for each alternative to facilitate comparison . <br />B. The RECIPIENT will prepare documentation for review by internal project stakeholders to examine alternatives . <br />RECIPIENT will convene one or two charrette style meetings to select a preferred option . Stakeholders may include internal <br />City surface water and maintenance and real property staff , Ecology and other environmental review staff . The RECIPIENT <br />will consult property owners, prior to selecting a preferred alternative. <br />C. The RECIPIENT will provide a description of the selection process and the preferred alternative selected . <br />D. The RECIPIENT will complete initial due diligence to ensure that the selected property has no major concerns , liens, etc. <br />before completing the design process. <br />Task Goal Statement: <br />The RECIPIENT will assess and select the best alternatives for advancement to final design with project stakeholders . <br />Task Expected Outcome: <br />Potential sites, contributing area, land use and property acquisition scenarios, and facility types will be compared and narrowed <br />down to a list for review at a charrette, where they will be narrowed down further to one design. <br />Template Version 10/30/2015 <br />Docusign Envelope ID: 7C66725B-AA08-42E8-B48A-416E600A0A3C
The URL can be used to link to this page
Your browser does not support the video tag.