Laserfiche WebLink
Page 5 of 11State of Washington Department of Ecology <br />City of Everett <br />100th St. SW Regional Stormwater Facility Study Project <br />Agreement No. WQC-2022-EverPW-00084 <br />2.3 Cultural Resources Review Form. Email the form and any supplemental <br />cultural resources documentation directly to the ECOLOGY Project <br />Manager. ECOLOGY will upload documentation to EAGL when <br />cultural resources is complete. <br />2.4 Inadvertent Discovery Plan. Upload to EAGL and notify ECOLOGY <br />when upload is complete. <br />CHANGES TO SCOPE OF WORK <br />Task Number:4 Task Cost: $32,000.00 <br />Task Title:Preliminary Design and Alternative Selection <br />Task Description: <br />The RECIPIENT will conduct a review of the available information and examine potential stormwater treatment and flow <br />control facilities that will serve both the existing developed areas and the future road improvements. <br />A. Using information collected in Data Collection task, the RECIPIENT shall prepare concept level design for potential flow <br />control and treatment facilities. Alternatives shall consider land use, contributing areas, property acquisition scenarios and <br />facility types. A comparative cost estimate shall be prepared for each alternative to facilitate comparison . <br />B. The RECIPIENT will prepare documentation for review by internal project stakeholders to examine alternatives . <br />RECIPIENT will convene one or two charrette style meetings to select a preferred option . Stakeholders may include internal <br />City surface water and maintenance and real property staff , Ecology and other environmental review staff . The RECIPIENT <br />will consult property owners, prior to selecting a preferred alternative. <br />C. The RECIPIENT will provide a description of the selection process and the preferred alternative selected . <br />D. The RECIPIENT will complete initial due diligence to ensure that the selected property has no major concerns , liens, etc. <br />before completing the design process. <br />Task Goal Statement: <br />The RECIPIENT will assess and select the best alternatives for advancement to final design with project stakeholders . <br />Task Expected Outcome: <br />Potential sites, contributing area, land use and property acquisition scenarios, and facility types will be compared and narrowed <br />down to a list for review at a charrette, where they will be narrowed down further to one design. <br />Template Version 10/30/2015 <br />Docusign Envelope ID: 7C66725B-AA08-42E8-B48A-416E600A0A3C