My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />April 1, 2025 <br /> <br /> <br />Mr. Seth Cirrotti-Caruso <br />Cochran Electric <br />12500 Aurora Avenue North <br />Seattle, Washington 98133 <br /> <br />Project: AquaSox Stadium <br /> Everett, Washington <br /> <br />Subject: Electrical Engineering Fee Proposal <br /> <br />Dear Seth: <br /> <br />Thank you for including Coffman Engineers, Inc. (Coffman) on your design-build team for the <br />AquaSox Stadium project. Our intention is to provide engineering services and document <br />production in support of your construction efforts. <br />PROJECT DESCRIPTION <br />The AquaSox Stadium project will construct a new baseball stadium for the Everett AquaSox in <br />downtown Everett, Washington. The new stadium is anticipated to have a new baseball field, <br />interior concessions, and back of house support space for facility operations. The project will be <br />performed in two parts, the first phase will take the design to a 100% Design Development (DD) <br />level of detail for GMP pricing. The second will take the design to a 100% Construction Document <br />(CD) level of design and construct the facility. <br />PROJECT SCHEDULE <br />The anticipated schedule and quantity of required submittals is as follows: <br />Schematic Design <br />50% Design Development <br />100% Design Development <br />50% Construction Documents <br />100% Construction Documents <br /> <br />The 100% Design Development package is anticipated to be issued the first week of September <br />8, 2025. The Construction Document phase is anticipated to last no longer than six months. <br />TERMS AND CONDITIONS <br />The attached Coffman's General Terms and Conditions will serve as our contract for services in <br />conjunction with this proposal. Specific terms and details of this proposal will govern where there <br />is a conflict between the two. <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.