My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Mr. Seth Cirrotti-Caruso <br />Cochran Electric <br />April 1, 2025 <br />Page 2 <br /> <br /> <br />SCOPE OF WORK <br />This proposal includes the following electrical engineering and document production in support of <br />Cochran Electric’s Construction efforts: <br />1. Coordinate with Snohomish County PUD (SnoPUD) to provide the design the electrical <br />service to the new stadium as. <br />2. Site plans showing the layout of electrical devices and duct bank routing between the service <br />transformer and main service switchboard. Site plans will also include the general routing <br />of the SnoPUD owned feeders and vaults. The design of the site SnoPUD feeders, vaults, <br />poles and other utility distribution will be by the Civil Engineer. <br />3. One-line drawing showing feeder and equipment sizes, available fault current values, and <br />energy metering. <br />4. Power floor plans showing receptacles and 120V and above electrical connections for <br />equipment installed and designed by other trades such as food service, telecom, AV, and <br />other low-voltage systems. Branch circuit wiring will be shown with circuit numbers next to <br />the devices. <br />5. Lighting plans showing the lighting layouts (by others) lighting control devices (occupancy <br />sensors, switches, photocells) as well as switching and daylighting zones and branch circuit <br />wiring with circuit numbers. Emergency lighting will be noted next to egress fixtures that <br />require battery or generator backup. <br />6. Mechanical power plans showing mechanical equipment connections with equipment <br />ratings and branch circuit wiring via circuit numbers next to the connections or in a <br />mechanical equipment schedule. <br />7. The design will be completed in a manner to achieve the agreed upon LEED points assigned <br />to the electrical discipline. Credits associated with lighting fixture selection and placement <br />will be coordinated with the lighting designer. <br />8. Provide the design for a generator to provide NEC 700 and 702 power to the building. <br />9. Coordinate with the Owner to provide connection points for broadcasting and event power. <br />10. Attend two hours of weekly design and coordination meetings throughout the design phase. <br />11. The electrical design will be produced in Revit to a LOD of 200. <br />12. Preliminary book form Division 26 specifications. <br />13. Construction Administration Services: <br />a. Construction Observation: Answer field questions in the form of RFIs. <br />b. Submittals: Review Contractor prepared submittals related to Coffman’s electrical <br />design. <br />c. As-Built Assistance: Incorporate field red-lines into the electronic files and panel <br />schedules. <br />d. Project Closeout: Provide a final drawing submittal package including panel schedules <br />in PDF and AutoCAD format. <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.