My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:56 PM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 5/1/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Mr. Seth Cirrotti-Caruso <br />Cochran Electric <br />April 1, 2025 <br />Page 2 <br /> <br /> <br />SCOPE OF WORK <br />This proposal includes the following electrical engineering and document production in support of <br />Cochran Electric’s Construction efforts: <br />1. Coordinate with Snohomish County PUD (SnoPUD) to provide the design the electrical <br />service to the new stadium as. <br />2. Site plans showing the layout of electrical devices and duct bank routing between the service <br />transformer and main service switchboard. Site plans will also include the general routing <br />of the SnoPUD owned feeders and vaults. The design of the site SnoPUD feeders, vaults, <br />poles and other utility distribution will be by the Civil Engineer. <br />3. One-line drawing showing feeder and equipment sizes, available fault current values, and <br />energy metering. <br />4. Power floor plans showing receptacles and 120V and above electrical connections for <br />equipment installed and designed by other trades such as food service, telecom, AV, and <br />other low-voltage systems. Branch circuit wiring will be shown with circuit numbers next to <br />the devices. <br />5. Lighting plans showing the lighting layouts (by others) lighting control devices (occupancy <br />sensors, switches, photocells) as well as switching and daylighting zones and branch circuit <br />wiring with circuit numbers. Emergency lighting will be noted next to egress fixtures that <br />require battery or generator backup. <br />6. Mechanical power plans showing mechanical equipment connections with equipment <br />ratings and branch circuit wiring via circuit numbers next to the connections or in a <br />mechanical equipment schedule. <br />7. The design will be completed in a manner to achieve the agreed upon LEED points assigned <br />to the electrical discipline. Credits associated with lighting fixture selection and placement <br />will be coordinated with the lighting designer. <br />8. Provide the design for a generator to provide NEC 700 and 702 power to the building. <br />9. Coordinate with the Owner to provide connection points for broadcasting and event power. <br />10. Attend two hours of weekly design and coordination meetings throughout the design phase. <br />11. The electrical design will be produced in Revit to a LOD of 200. <br />12. Preliminary book form Division 26 specifications. <br />13. Construction Administration Services: <br />a. Construction Observation: Answer field questions in the form of RFIs. <br />b. Submittals: Review Contractor prepared submittals related to Coffman’s electrical <br />design. <br />c. As-Built Assistance: Incorporate field red-lines into the electronic files and panel <br />schedules. <br />d. Project Closeout: Provide a final drawing submittal package including panel schedules <br />in PDF and AutoCAD format. <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.