Laserfiche WebLink
Mr. Seth Cirrotti-Caruso <br />Cochran Electric <br />April 1, 2025 <br />Page 2 <br /> <br /> <br />SCOPE OF WORK <br />This proposal includes the following electrical engineering and document production in support of <br />Cochran Electric’s Construction efforts: <br />1. Coordinate with Snohomish County PUD (SnoPUD) to provide the design the electrical <br />service to the new stadium as. <br />2. Site plans showing the layout of electrical devices and duct bank routing between the service <br />transformer and main service switchboard. Site plans will also include the general routing <br />of the SnoPUD owned feeders and vaults. The design of the site SnoPUD feeders, vaults, <br />poles and other utility distribution will be by the Civil Engineer. <br />3. One-line drawing showing feeder and equipment sizes, available fault current values, and <br />energy metering. <br />4. Power floor plans showing receptacles and 120V and above electrical connections for <br />equipment installed and designed by other trades such as food service, telecom, AV, and <br />other low-voltage systems. Branch circuit wiring will be shown with circuit numbers next to <br />the devices. <br />5. Lighting plans showing the lighting layouts (by others) lighting control devices (occupancy <br />sensors, switches, photocells) as well as switching and daylighting zones and branch circuit <br />wiring with circuit numbers. Emergency lighting will be noted next to egress fixtures that <br />require battery or generator backup. <br />6. Mechanical power plans showing mechanical equipment connections with equipment <br />ratings and branch circuit wiring via circuit numbers next to the connections or in a <br />mechanical equipment schedule. <br />7. The design will be completed in a manner to achieve the agreed upon LEED points assigned <br />to the electrical discipline. Credits associated with lighting fixture selection and placement <br />will be coordinated with the lighting designer. <br />8. Provide the design for a generator to provide NEC 700 and 702 power to the building. <br />9. Coordinate with the Owner to provide connection points for broadcasting and event power. <br />10. Attend two hours of weekly design and coordination meetings throughout the design phase. <br />11. The electrical design will be produced in Revit to a LOD of 200. <br />12. Preliminary book form Division 26 specifications. <br />13. Construction Administration Services: <br />a. Construction Observation: Answer field questions in the form of RFIs. <br />b. Submittals: Review Contractor prepared submittals related to Coffman’s electrical <br />design. <br />c. As-Built Assistance: Incorporate field red-lines into the electronic files and panel <br />schedules. <br />d. Project Closeout: Provide a final drawing submittal package including panel schedules <br />in PDF and AutoCAD format. <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal