My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:56 PM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 5/1/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
16 <br />Progressive Design Build Contract <br /> <br /> <br /> Article 10 <br />Representatives of the Parties <br />10.1 Owner’s Representatives. <br /> <br />10.1.1 Owner designates the individual listed below as its Senior Representative (“Owner’s Senior <br />Representative”), which individual has the authority and responsibility for avoiding and resolving <br />disputes under Section 10.7.2 of the General Conditions to the extent permitted by the Legal <br />Requirements: <br /> <br />Scott Pattison, City of Everett. <br /> <br /> <br />10.1.2 Owner designates the individual listed below as its Owner’s Representative, which <br />individual has the authority and responsibility set forth in Section 3.3 of the General Conditions to <br />the extent permitted by the Legal Requirements: <br /> <br />Ethan Bernau, SOJ. <br />10.2 Design-Builder’s Representatives. <br /> <br />10.2.1 Design-Builder designates the individual listed in the table in Section 10.3 below as its <br />Senior Representative ("Design-Builder’s Senior Representative"), which individual has the <br />authority and responsibility for avoiding and resolving disputes under Section 10.7.2 of the General <br />Conditions. <br /> <br />10.2.2 Design-Builder designates the individual listed in the table in Section 10.3 below as its <br />Design-Builder’s Representative, which individual has the authority and responsibility set forth in <br />Section 2.1.1 of the General Conditions. <br /> <br />10.3 Key Personnel. Design-Builder has been selected for this Project based on not only its <br />qualifications as a corporate entity, but also upon the basis of the qualifications of the key personnel it <br />intends to employ to perform the Work. Design-Builder agrees to provide all professional personnel <br />necessary, at adequate staffing levels, to perform the required services under this Contract, including the <br />key personnel identified below:
The URL can be used to link to this page
Your browser does not support the video tag.