My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Program Summary <br />Everett Multipurpose Stadium <br />Everett, WA <br />March 2025 <br />6.0 ADMINISTRATIVE FACILITIES <br />Class <br />No.Space Type Units SF Total SF Description USL MiLB <br />6.1 ADMINISTRATIVE OFFICES (M & W)4,840 <br />6.1.1 Reception / Waiting Area 0 200 0 <br />6.1.2 Offices - Walled 6-8 walled offices <br />6.1.2.a Team Owner 2 250 500 <br />6.1.2.b Team President 2 250 500 <br />6.1.2.c General Manager 2 220 440 <br />6.1.2.d Asst. General Manager 2 200 400 <br />6.1.2.e Merchandise Manager 0 150 0 <br />6.1.2.f Office Manager 0 150 0 <br />6.1.2.g Accounting Manager 0 150 0 <br />6.1.2.h Director of Promotions 0 150 0 <br />6.1.2.i Media Relations 0 150 0 <br />6.1.2.j TBD 0 150 0 <br />6.1.3. Board Room 0 600 0 <br />6.1.4 Conference Rooms 0 250 0 Shared with MiLB <br />6.1.5 Open Office (10 cubicles)30 100 3,000 Thirty (30) between mens and womens teams. <br />6.1.6 Kitchen / Break Room 0 200 0 Shared with MiLB <br />6.1.7 Copy / Mail / Work Room 0 200 0 Shared with MiLB <br />6.1.8 IT / Telecommunications Room 0 120 0 Shared with MiLB <br />6.1.9 Toilet - Women 0 180 0 Provide 2 water closets, 2 lavs, 1 shower. <br />6.1.10 Toilet - Men 0 180 0 Provide 1 urinal, 1 water closet, 2 lavs, 1 shower. <br />6.2 Ticketing 0 <br />6.2.1 Ticket Windows 0 200 0 Provide four (4) ticket windows adjacent to Main Entrance. <br />6.2.2 Offices - Walled <br />6.2.2.a Ticket Manager & assistant mgr 0 300 0 Shared office space <br />6.2.3 Man Trap 0 100 0 Provides access to Counting Room. <br />6.2.4 Counting Room 0 200 0 Includes safe. <br />Total - Enclosed Areas 4,840 NSF <br /> Net to gross 35%1,700 SF <br />TOTAL 6,540 GSF <br />3/6/2025 Page 4 of 7 <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit B - Owner's Initial Project Program
The URL can be used to link to this page
Your browser does not support the video tag.