My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:56 PM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 5/1/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Program Summary <br />Everett Multipurpose Stadium <br />Everett, WA <br />March 2025 <br />6.0 ADMINISTRATIVE FACILITIES <br />Class <br />No.Space Type Units SF Total SF Description USL MiLB <br />6.1 ADMINISTRATIVE OFFICES (M & W)4,840 <br />6.1.1 Reception / Waiting Area 0 200 0 <br />6.1.2 Offices - Walled 6-8 walled offices <br />6.1.2.a Team Owner 2 250 500 <br />6.1.2.b Team President 2 250 500 <br />6.1.2.c General Manager 2 220 440 <br />6.1.2.d Asst. General Manager 2 200 400 <br />6.1.2.e Merchandise Manager 0 150 0 <br />6.1.2.f Office Manager 0 150 0 <br />6.1.2.g Accounting Manager 0 150 0 <br />6.1.2.h Director of Promotions 0 150 0 <br />6.1.2.i Media Relations 0 150 0 <br />6.1.2.j TBD 0 150 0 <br />6.1.3. Board Room 0 600 0 <br />6.1.4 Conference Rooms 0 250 0 Shared with MiLB <br />6.1.5 Open Office (10 cubicles)30 100 3,000 Thirty (30) between mens and womens teams. <br />6.1.6 Kitchen / Break Room 0 200 0 Shared with MiLB <br />6.1.7 Copy / Mail / Work Room 0 200 0 Shared with MiLB <br />6.1.8 IT / Telecommunications Room 0 120 0 Shared with MiLB <br />6.1.9 Toilet - Women 0 180 0 Provide 2 water closets, 2 lavs, 1 shower. <br />6.1.10 Toilet - Men 0 180 0 Provide 1 urinal, 1 water closet, 2 lavs, 1 shower. <br />6.2 Ticketing 0 <br />6.2.1 Ticket Windows 0 200 0 Provide four (4) ticket windows adjacent to Main Entrance. <br />6.2.2 Offices - Walled <br />6.2.2.a Ticket Manager & assistant mgr 0 300 0 Shared office space <br />6.2.3 Man Trap 0 100 0 Provides access to Counting Room. <br />6.2.4 Counting Room 0 200 0 Includes safe. <br />Total - Enclosed Areas 4,840 NSF <br /> Net to gross 35%1,700 SF <br />TOTAL 6,540 GSF <br />3/6/2025 Page 4 of 7 <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit B - Owner's Initial Project Program
The URL can be used to link to this page
Your browser does not support the video tag.