My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Program Summary <br />Everett Multipurpose Stadium <br />Everett, WA <br />March 2025 <br />SQUARE FOOTAGE SUMMARY <br />Class <br />No.Class Type <br />Building Building <br />Enclosed Not Enclosed <br />1.0 Site Requirements -9,000 SF <br />2.0 Spectator Seating -- <br />3.0 Spectator Facilities 0 NSF 0 SF <br />4.0 Food & Retail Facilities 750 NSF - <br />5.0 Media Facilities 0 NSF 448 SF <br />6.0 Administrative Facilities 4,840 NSF - <br />7.0 Team / Event Facilities 5,300 NSF - <br />8.0 Playing Field Facilities 0 NSF - <br />9.0 Service & Operations Facilities 1,875 NSF 0 SF <br />10.0 Sound System & Scoreboard -- <br />Subtotal Building Area 12,765 NSF 9,448 SF <br /> Seating Area - Concrete 0 SF <br /> Seating Area - Grass 0 SF <br /> Playing Field - Grass 100,000 SF <br /> Outdoor Equipment Storage 0 SF <br /> Loading Dock Area 0 SF <br />Total Building Area - Base Project 16,325 GSF 109,448 SF <br />3/6/2025 Page 7 of 7 <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit B - Owner's Initial Project Program
The URL can be used to link to this page
Your browser does not support the video tag.