My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 2 <br /> <br /> <br /> <br />c. The Advanced Civil Design Services equaling 80% of the fee is moved below the line. With <br />what we have learned about the site, the configuration, likely soil and underground <br />conditions, KPFF is able to provide a fee more aligned with the scope of work. This fee is <br />very specific to the site and configuration that has been provided. <br />d. MEP is provided as fee through the sub -trade contractors (Johansen and Cochrane) and <br />they were not provided in our matrix. Without their fee included directly here, it is more <br />expected that the basic services would be less than 6%. <br />e. Fee by Phase % was modified per below: <br />i. DD modified to 25% from 28% <br />ii. CD modified to 29% from 26% <br />f. Typical Reimbursables (Local Expenses) <br />i. Anticipating a trip per week during CA , as discussed – we have already bumped <br />down from 3% to 2%. <br />g. Commissioning (Cx) <br />i. Fee reduced by $2,680. <br />ii. This scope needs to be coordinated with Johansen Mechanical. The Cx team would <br />prefer to be contracted directly to the Owner, if possible. <br />h. LEED / Energy Modeling <br />i. Energy Modeling fee reduced by $2,500. <br />i. Signage and Wayfinding <br />i. Fee reduced by $26,500 . <br />j. Structural <br />i. Reduced to 1% from 1.25% (reduction of $105,000) assuming the schedule is still <br />September GMP and December CDs with April 2027 completion. Please note this <br />modification would exclude the following scope items: <br />1. Early drawing packages. Construction drawings will be delivered <br />December 2025. <br />2. Deep foundation design/detailing and any associated structural slabs at <br />grade that may be required because of the need for deep <br />foundations. I’m anticipating conventional, shallow foundations, but I <br />want this out there just in case. <br />3. Design/detailing of MEP support and seismic bracing/anchorage of those <br />components. <br />k. Technology <br />i. Fee reduced by $16,104. <br />3. Programming fee was not provided as the work is complete in this phase. However, it is a fee that <br />is required to be included. You will note at the end of the proposal, we have deducted the pre - <br />payment of $70,000 that was provided by you for starting this p hase. As discussed, the scope for <br />both DLR Group and Bayley has exceeded the stipend amount and we need to include in this <br />proposal. <br />4. Landscape architecture is fairly undefined at this time. We have conversations with a good partner, <br />Walker Macy, but because we don’t have the programming or design of how the building will be <br />integrated in the city, we cannot define the budget. We have pr ovided a line item budget and <br />anticipate they can design the need within this scope. Should the design deviate from the <br />orientation and opportunities, this may need to be revisited and an additional service requested. <br />5. IT/LV/Security and Acoustics/AV have been combined into one proposal, and we have lumped their <br />fee proposal into one number. It is just slightly higher when you lump them together. <br />6. A DLR Group 10% mark up for the services from sub -consultants has been added. This only <br />accounts for the consultants we have brought onto the project, not all additional services. <br /> <br />Some items have been moved to Excluded or Optional services: <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.