My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:56 PM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 5/1/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Mr. Andy West <br />April 8, 2025 <br />Page 3 <br /> <br /> <br /> <br /> PHASE 1 PHASE 2 (NIC) <br /> SD DD/GMP <br />Building <br />Demolition <br />Permit* <br />CD+ <br />Subsequent <br />Permit <br />Packages+ <br />PLAN SHEETS <br />Notes/Cover Sheet ♦ ♦ ♦ ♦ <br />Construction Baseline Plan ♦ ♦ <br />Temporary Erosion and <br />Sediment Control (TESC) <br />Plan <br /> ♦ ♦ ♦ <br /> <br />TESC Details ♦ ♦ ♦ <br />Site Demolition Plan ♦ ♦ ♦ <br />Site Demolition Details ♦ ♦ <br />Foundation Drainage Plan ♦ ♦ <br />Site Utility and Storm <br />Drainage Plan ♦ ♦ ♦ <br />Site Utility and Storm <br />Drainage Profiles and <br />Details <br /> <br /> <br />♦ ♦ <br />SnoPUD Reroute Plan ♦ ♦ ♦ <br />SnoPUD Reroute Profile ♦ ♦ <br />Paving and Grading Plan ♦ ♦ ♦ <br />Grading Details and <br />Enlargements ♦ <br />Paving Details ♦ ♦ ♦ <br />SUPPORTING <br />DOCUMENTS <br />Storm Drainage Report ♦ ♦ ♦ ♦ <br />Civil Design Narrative ♦ <br />Specifications ♦ ♦ ♦ <br />Utility Reroute Exhibit ♦ <br />NUMBER OF TEAM <br />MEETINGS 4 24 12 <br /> DRAFTDesign-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.