Laserfiche WebLink
Mr. Andy West <br />April 8, 2025 <br />Page 3 <br /> <br /> <br /> <br /> PHASE 1 PHASE 2 (NIC) <br /> SD DD/GMP <br />Building <br />Demolition <br />Permit* <br />CD+ <br />Subsequent <br />Permit <br />Packages+ <br />PLAN SHEETS <br />Notes/Cover Sheet ♦ ♦ ♦ ♦ <br />Construction Baseline Plan ♦ ♦ <br />Temporary Erosion and <br />Sediment Control (TESC) <br />Plan <br /> ♦ ♦ ♦ <br /> <br />TESC Details ♦ ♦ ♦ <br />Site Demolition Plan ♦ ♦ ♦ <br />Site Demolition Details ♦ ♦ <br />Foundation Drainage Plan ♦ ♦ <br />Site Utility and Storm <br />Drainage Plan ♦ ♦ ♦ <br />Site Utility and Storm <br />Drainage Profiles and <br />Details <br /> <br /> <br />♦ ♦ <br />SnoPUD Reroute Plan ♦ ♦ ♦ <br />SnoPUD Reroute Profile ♦ ♦ <br />Paving and Grading Plan ♦ ♦ ♦ <br />Grading Details and <br />Enlargements ♦ <br />Paving Details ♦ ♦ ♦ <br />SUPPORTING <br />DOCUMENTS <br />Storm Drainage Report ♦ ♦ ♦ ♦ <br />Civil Design Narrative ♦ <br />Specifications ♦ ♦ ♦ <br />Utility Reroute Exhibit ♦ <br />NUMBER OF TEAM <br />MEETINGS 4 24 12 <br /> DRAFTDesign-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal