My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Everett Outdoor Multipurpose Stadium <br />Professional Services Proposal <br />Page 4 of 4 <br />SCHEDULE B <br /> <br />Professional Engineering & Landscape Architecture Services <br />Everett Outdoor Multipurpose Stadium <br /> <br />FEE PROPOSAL <br /> <br />1.9 COMPENSATION AND PAYMENT TO ENGINEER <br /> <br />A. We offer a lumpāsum fee for all basic scope work as follows: <br />Task 1 Schematic Design (15%) 18,750 <br />Task 2 Design Development (20%) 25,000 <br />Task 3 Construction Documents (35%) 43,750 <br />Tasks 4 & 5 Construction Administration, Closeout (30%) 37,500 <br />Sub Total (about 3.65% of anticipated Construction value) $ 125,000 <br /> <br />B. All Contractor construction negotiations and change order processing within original scope of project <br />is included in this amount. <br /> <br />C. Compensation for additional services that may be requested by the Owner, including expert witness <br />in the event of any litigation, shall be as follows (2025 Hourly Billing Rates): <br /> <br />Principal Engineer $255.00 <br />Principal Landscape Architect $255.00 <br />Project Engineer $205.00 <br />Project Landscape Architect $205.00 <br />Construction Manager/Project Manager $155.00 <br />Engineering Technician II $145.00 <br />Technical Staff/Cad Drafting $145.00 <br />Landscape Designer $130.00 <br />Engineering Technician I $120.00 <br />Administrative $85.00 <br /> <br />D. Expenses as requested and authorized by Owner to be paid by our firm and shall be reimbursed at <br />actual cost plus 10% administrative fee. No reimbursable expenses are anticipated at this time. <br /> <br />ACCEPTED BY: <br /> <br />By: __________________________________ By: <br /> Eric Gold, Principal <br />Title: _________________________________ <br /> <br />Date: ________________________________ Date: April 2, 2025 <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.