My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Andy West <br />WJ HW Proposal –Everett Mul tipurpose Stadium <br />April 2 , 2 025 <br />Page 2 of 11 <br />WJHW, Inc. <br />Designers and Planners for Sound, Video, Security, <br />Telecommunication, Broadcast, Theatre & Acoustics <br /> <br />· Coordinate our services with those of the design team, Owner and other design/development <br />consultants involved in the project. <br />· Work in a coordinated and cooperative fashion with the design team and Owner to achieve <br />the performance, appearance, and flexibility necessary for the project. <br />· Coordinate electrical, weight and cooling requirements for our systems with the MEP and <br />structural design consultants. <br />· Attend project meetings as required to meet the needs and schedule of the project, within the <br />approved allocated meeting budget and expense allowance. <br />· Provide written documentation, as appropriate, of all meetings and telephone conversations <br />initiated by WJHW, and distribute copies to design team, Owner, and other <br />design/development consultants. <br />· Submit progress documentation as required in each phase. <br />Schematic Design <br />WJHW will: <br />· Meet with Architect, Owner, and other design/development consultants to develop an <br />understanding of the design requirements for the project. <br />· Preliminary analysis of acoustics recommendations for other design team members to <br />consider in their designs. <br />· Provide comparative information to the development and design team based on our <br />experience with similar facilities. <br />· Review alternative system design concepts for cost efficiency and suitability. <br />· Provide a written report/narrative for each system that outlines the design options selected by <br />Owner and the design team along with options for any remaining outstanding decisions. <br />· Provide pre-design estimates of probable cost based on historical costs of recent similar <br />developments. We will rely upon Owner’s development team and their construction consultants <br />to make any inflation or geographical adjustments to these estimates which are specific to the <br />project and its environs. <br />Design Development <br />Once the technical systems program and budgets have been approved by the Owner, WJHW will <br />develop DD level documentation. <br />· Review architectural and other Project drawings and provide layout needs of all required <br />support locations/rooms relative to our scopes. <br />· Provide product information, mounting methods, and heights, as needed, for all items <br />penetrating architectural finishes. <br />· Provide outline specifications or narratives and drawings (floor plans, conduit and cable riser <br />diagrams, cabling, diagrams, equipment schedules, equipment elevations and details) <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.