My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Andy West <br />WJ HW Proposal –Everett Mul tipurpose Stadium <br />April 2 , 2 025 <br />Page 5 of 11 <br />WJHW, Inc. <br />Designers and Planners for Sound, Video, Security, <br />Telecommunication, Broadcast, Theatre & Acoustics <br /> <br />In-House Video Production System <br />· Analysis of the needs of Owner /operator’s production staff, along with a review of the options <br />(HDR, 4K, IP, etc.) for accomplishing the goals of the staff within the construction and operational <br />budget for the project. <br />· Anticipating a typical system in support of the seating bowl video displays, provide a design <br />and documentation package to allow the video production and equipment system to be <br />designed in its entirety, and bid separately (if desired) from the remainder of the building <br />packages. <br />· Coordinate space requirements with architect, MEP designer, Owner/operator. <br />· Design work for a facility which is capable of extensive non-game day production, broadcast <br />origination, studio equipment and acoustical design is not included in this base scope of work. <br />WJHW’s fee is based on the total systems design budget for a 4K SMPTE 2110 video replay <br />system not exceeding $2 million USD. <br />Broadcast Cabling System <br />Our base scope includes reviewing, determining the project requirements for and documenting: <br />· Camera and broadcast positions and space required to accommodate broadcast and in- <br />house production cameras. <br />· Pathways and infrastructure for designed and future permanent cabling. <br />· TV truck parking location, access, space, power. <br />· Cabling in support of broadcast, official’s replay, player tracking, video coaching, etc. <br />· These systems will be designed to allow the most convenient access possible for broadcaster <br />and facility operations. <br />Acoustics and Noise Control <br />We will provide design criteria for partitions, room acoustics and MEP systems noise control. When <br />design documents are available, we will complete a review of and specific recommendations for: <br />· Club, Suite and other back of house areas acoustical treatment <br />· HVAC noise control in the sensitive areas listed above. <br />· Partitions surrounding noise sensitive areas (such as private offices, conference/meeting <br />rooms) and noisy spaces such as mechanical rooms. <br />· Our work will include coordination with the architect on assessing and recommending finish <br />materials and partition details in order to best integrate the acoustical requirements into the <br />architectural and budgetary design constraints. <br />· Our recommendations for construction methods, materials and/or details to control noise and <br />vibration will be provided to the MEP engineers for incorporation into their documents. <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.