My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Andy West <br />WJ HW Proposal –Everett Mul tipurpose Stadium <br />April 2 , 2 025 <br />Page 6 of 11 <br />WJHW, Inc. <br />Designers and Planners for Sound, Video, Security, <br />Telecommunication, Broadcast, Theatre & Acoustics <br /> <br />· Provide design recommendations for partition types, room shapes and finishes where sound <br />isolation and acoustical quality are important. Recommendations will be provided that <br />conform with established background noise criteria (NC level) for occupied spaces as well as <br />recommendations to define standards for STC wall ratings and limiting the transmission of <br />noise from one function to an adjacent function. <br />· Recommendations will be written with detailed drawings in sketch form and manufacturer's cut <br />sheets for use by the design team in developing working drawings. <br />Structured Cabling System (Tel/Data, Wi-Fi, PoS, BMS, etc.) <br />· Coordination and design of the low voltage systems throughout the facility, including the <br />telephone and data cabling, TV, surveillance and access control, point of sale and building <br />management systems throughout the project. <br />· Work with the architectural team to establish room sizes and locations, along with anticipated <br />heat and power loads and determination of the cabling and device location information from <br />each of the low voltage systems. <br />· Determine the appropriate pathways, including redundant paths for critical elements, provide <br />documentation of the conduit, riser, and cable tray requirements. This work includes working <br />with Owner or Architect to determine appropriate riser closets, locations, layout, sleeves, and <br />distribution of cabling within each closet. <br />· Specify an appropriate cabling system to support telephone and data cabling. This cabling <br />system will consist of appropriate station cabling as well as a backbone to support the station <br />cabling. <br />· Design the technical infrastructure of the backbone of this system to consist of fiber, telephone <br />trunk cabling, as well as the appropriate interconnects of patch panels, jack panels and cross <br />connects to the station cabling. <br />· Coordinate the design with the other systems to eliminate duplicate conduit and cable tray <br />systems. Future cable management and maintenance is also improved as the as-built records <br />of cabling are contained in a single document, eliminating the need to refer to several sets of <br />drawings to obtain the complete picture. <br />· Documentation of Wi-Fi AP locations per owner direction. <br />· Documentation of owner-designated and located video coaching/player tracking cabling <br />Surveillance and Access Control Systems <br />We will: <br />· Work with the Owner/Building Operator, and within their published standards, to design and <br />coordinate all infrastructure and pathways required for building surveillance, access control, <br />and intrusion detection. <br />· Coordination of door hardware and mounting locations, including assistance (but not <br />authorship) to the design team on the preparation of the door schedules. <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.