Laserfiche WebLink
Andy West <br />WJ HW Proposal –Everett Mul tipurpose Stadium <br />April 2 , 2 025 <br />Page 7 of 11 <br />WJHW, Inc. <br />Designers and Planners for Sound, Video, Security, <br />Telecommunication, Broadcast, Theatre & Acoustics <br /> <br />· These systems will be specified in accordance with the Owner and authorities’ life safety and <br />building access practices for all equipment, software, and configuration. <br />· Design system and equipment specifications, one-line diagrams and details as appropriate. <br />· Document the required integration into the Project Design for a fully functional system and <br />program, e.g., coordination of all door hardware, etc. <br />FEES <br />We propose to perform the design efforts described in this proposal for the fixed fees shown below <br />exclusive of reimbursable expenses. This fee indicates a level of professional service which is consistent <br />with our past work on similarly sized facilities. Any consulting and or design activities we are asked to <br />perform which are not listed in this proposal will be considered an additional service and fee. <br />PHASE 1 SCOPE SD DD Totals Person <br />Days <br />on Site <br />Bowl Sound/AV/TV Systems $4,500 $18,200 $22,700 1 <br />LED Display System $1,800 $7,300 $9,100 0 <br />In-House Video Production $3,000 $12,200 $15,200 1 <br />Broadcast Cabling $1,500 $6,100 $7,600 0 <br />Acoustics/Noise Control $1,000 $3,000 $4,000 0 <br />Structured Cabling System $2,700 $11,000 $13,700 1 <br />Surveillance & Access Control $1,700 $6,700 $8,400 1 <br />TOTALS $16,200 $64,500 $80,700 4 <br /> <br />PHASE 2 SCOPE CD CA Totals Person <br />Days <br />on Site <br />Bowl Sound/AV/TV Systems $20,000 $14,200 $34,200 4 <br />LED Display System $8,000 $5,700 $13,700 1 <br />In-House Video Production $13,300 $9,500 $22,800 3 <br />Broadcast Cabling $6,700 $4,800 $11,500 1 <br />Acoustics/Noise Control $4,300 $1,000 $5,300 0 <br />Structured Cabling System $12,000 $8,600 $20,600 2 <br />Surveillance & Access Control $7,300 $5,200 $12,500 2 <br />TOTALS $71,600 $49,000 $120,600 13 <br /> <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal <br />P1 and P2 fee total <br />revised to $185,196 <br />dated April 18. <br />Revised proposal <br />forthcoming.