My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Andy West <br />WJ HW Proposal –Everett Mul tipurpose Stadium <br />April 2 , 2 025 <br />Page 8 of 11 <br />WJHW, Inc. <br />Designers and Planners for Sound, Video, Security, <br />Telecommunication, Broadcast, Theatre & Acoustics <br /> <br />WJHW’s fees assume that all services shall be accepted as part of this proposal. WJHW reserves the <br />right to renegotiate our fee estimates should the project’s final program, design direction and scope <br />differ from what is outlined above. <br />PROJECT MEETINGS <br />We anticipate participating in video or phone conferences for most coordination meetings <br />associated with the project as we do not foresee our in-person attendance will be required at all <br />meetings and presentations. We request that we only be asked to participate in those meetings when <br />our scope of efforts is being discussed or our technical expertise is required. <br />PROJECT-RELATED REIMBURSABLE EXPENSES <br />Project-related reimbursable expenses are considered to include, but are not limited to, non-stop, <br />coach airfare travel and fees, lodging, mileage at prevailing IRS rates, rental car, meals while traveling, <br />printing, expedited delivery, etc. and are invoiced in addition to our professional fees. Any penalty or fee <br />which is imposed on us by any common carrier or hotelier as a result of itinerary changes that are <br />necessitated by a meeting schedule which is changed by Owner/design team will be invoiced as a <br />reimbursable expense. <br />EXCLUSIONS <br />The following services are not a part of our basic services but can be addressed in an addendum to <br />this proposal if deemed necessary: <br />· Environmental Noise Assessment <br />· Network Electronics design and specifications (switches, phones, Wi-Fi APs, printer, etc.) <br />· Point of Sale Systems <br />· Fire Alarm and Life Safety System design or intelligibility review. <br />· Distributed Antenna System (DAS) for consumer carriers and public safety (ERRC) <br />· Video Coaching, Analytics, Player Tracking and Medical Equipment Design <br />· Television and Bracket Schedule <br />· On-Site Project Management <br />· Post Occupancy review, testing and report, Two-year warranty inspections. <br />· Additional acceptance testing or systems adjustment to accommodate changes in the <br />design that are beyond the control of WJHW. <br />· Any LEED/Green Certification paperwork preparation and submission. <br />· Preparation of record documents that include contractor markups. <br />BIM DOCUMENTATION <br />WJHW has the capability of preparing our documents in Revit for the design development and <br />construction document phases as directed. If utilizing Revit, models will be produced up to a Level of <br />Development (LOD) of 300 during the construction document phase. Elements and details not modeled <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.