My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-94 May 6, 2025 <br /> <br /> 1 <br />e. Number of sublots to be placed, sequencing of density testing, and other 2 <br />sampling and testing. 3 <br /> 4 <br />5-04.3(15) Sealing Pavement Surfaces 5 <br />Apply a fog seal where shown in the plans. Construct the fog seal in accordance with 6 <br />Section 5-02.3. Unless otherwise approved by the Engineer, apply the fog seal prior to 7 <br />opening to traffic. 8 <br /> 9 <br />5-04.3(16) HMA Road Approaches 10 <br />Construct HMA approaches at the locations shown in the Plans or where staked by the 11 <br />Engineer, in accordance with Section 5-04. 12 <br /> 13 <br />5-04.4 Measurement 14 <br />HMA Cl. ___ PG ___, HMA for ___ Cl. ___ PG ___, and Commercial HMA will 15 <br />be measured by the ton in accordance with Section 1-09.2, with no deduction being 16 <br />made for the weight of asphalt binder, mineral filler, or any other component of the 17 <br />mixture. If the Contractor elects to remove and replace mix as allowed by Section 5-18 <br />04.3(11), the material removed will not be measured. 19 <br /> 20 <br />Roadway cores will be measured per each for the number of cores taken. 21 <br /> 22 <br />Pavement repair excavation will be measured by the square yard of surface marked prior 23 <br />to excavation. 24 <br /> 25 <br />Planing bituminous pavement will be measured by the square yard. 26 <br /> 27 <br />5-04.5 Payment 28 <br />Payment will be made for each of the following Bid items that are included in the 29 <br />Proposal: 30 <br /> 31 <br />“HMA Cl. ___ PG ___”, per ton. 32 <br /> 33 <br />“HMA for Approach Cl. ___ PG ___”, per ton. 34 <br /> 35 <br />“HMA for Preleveling Cl. ___ PG ___”, per ton. 36 <br /> 37 <br />“HMA for Pavement Repair Cl. ___ PG ___”, per ton. 38 <br /> 39 <br />“Commercial HMA”, per ton. 40 <br /> 41 <br />The unit Contract price per ton for “HMA Cl. ___ PG ___”, “HMA for Approach Cl. 42 <br />___ PG ___”, “HMA for Preleveling Cl. ___ PG ___”, “HMA for Pavement Repair Cl. 43 <br />___ PG ___”, and “Commercial HMA” shall be full compensation for all costs, 44 <br />including anti-stripping additive, incurred to carry out the requirements of Section 5-45
The URL can be used to link to this page
Your browser does not support the video tag.