My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-95 May 6, 2025 <br /> <br />04 except for those costs included in other items which are included in this 1 <br />Subsection and which are included in the Proposal. 2 <br /> 3 <br /> 4 <br />“Pavement Repair Excavation Incl. Haul”, per square yard. 5 <br /> 6 <br />The unit Contract price per square yard for “Pavement Repair Excavation Incl. Haul” 7 <br />shall be full payment for all costs incurred to perform the Work described in Section 8 <br />5-04.3(4) with the exception, however, that all costs involved in the placement of 9 <br />HMA shall be included in the unit Contract price per ton for “HMA for Pavement 10 <br />Repair Cl. ___ PG ___”, per ton. 11 <br /> 12 <br />“Asphalt for Prime Coat”, per ton. 13 <br /> 14 <br />The unit Contract price per ton for “Asphalt for Prime Coat” shall be full payment for 15 <br />all costs incurred to obtain, provide and install the material in accordance with 16 <br />Section 5-04.3(4). 17 <br /> 18 <br />“Prime Coat Agg.”, per cubic yard, or per ton. 19 <br /> 20 <br />The unit Contract price per cubic yard or per ton for “Prime Coat Agg.” shall be full 21 <br />pay for furnishing, loading, and hauling aggregate to the place of deposit and 22 <br />spreading the aggregate in the quantities required by the Engineer. 23 <br /> 24 <br />“Planing Bituminous Pavement ***(2” Deep)***”, per square yard. 25 <br /> 26 <br />The unit Contract price per square yard for “Planing Bituminous Pavement” shall be 27 <br />full payment for all costs incurred to perform the Work described in Section 5-28 <br />04.3(14). 29 <br /> 30 <br />“Job Mix Compliance Price Adjustment”, by calculation. 31 <br /> 32 <br />“Job Mix Compliance Price Adjustment” will be calculated and paid for as described 33 <br />in Section 5-04.3(9)C6. 34 <br /> 35 <br />“Compaction Price Adjustment”, by calculation. 36 <br /> 37 <br />“Compaction Price Adjustment” will be calculated and paid for as described in 38 <br />Section 5-04.3(10)D3. 39 <br /> 40 <br />“Roadway Core”, per each. 41 <br /> 42 <br />The Contractor’s costs for all Work associated with the coring (e.g., traffic control) 43 <br />shall be incidental and included in the unit Bid price per each. 44 <br /> 45
The URL can be used to link to this page
Your browser does not support the video tag.