Laserfiche WebLink
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-95 May 6, 2025 <br /> <br />04 except for those costs included in other items which are included in this 1 <br />Subsection and which are included in the Proposal. 2 <br /> 3 <br /> 4 <br />“Pavement Repair Excavation Incl. Haul”, per square yard. 5 <br /> 6 <br />The unit Contract price per square yard for “Pavement Repair Excavation Incl. Haul” 7 <br />shall be full payment for all costs incurred to perform the Work described in Section 8 <br />5-04.3(4) with the exception, however, that all costs involved in the placement of 9 <br />HMA shall be included in the unit Contract price per ton for “HMA for Pavement 10 <br />Repair Cl. ___ PG ___”, per ton. 11 <br /> 12 <br />“Asphalt for Prime Coat”, per ton. 13 <br /> 14 <br />The unit Contract price per ton for “Asphalt for Prime Coat” shall be full payment for 15 <br />all costs incurred to obtain, provide and install the material in accordance with 16 <br />Section 5-04.3(4). 17 <br /> 18 <br />“Prime Coat Agg.”, per cubic yard, or per ton. 19 <br /> 20 <br />The unit Contract price per cubic yard or per ton for “Prime Coat Agg.” shall be full 21 <br />pay for furnishing, loading, and hauling aggregate to the place of deposit and 22 <br />spreading the aggregate in the quantities required by the Engineer. 23 <br /> 24 <br />“Planing Bituminous Pavement ***(2” Deep)***”, per square yard. 25 <br /> 26 <br />The unit Contract price per square yard for “Planing Bituminous Pavement” shall be 27 <br />full payment for all costs incurred to perform the Work described in Section 5-28 <br />04.3(14). 29 <br /> 30 <br />“Job Mix Compliance Price Adjustment”, by calculation. 31 <br /> 32 <br />“Job Mix Compliance Price Adjustment” will be calculated and paid for as described 33 <br />in Section 5-04.3(9)C6. 34 <br /> 35 <br />“Compaction Price Adjustment”, by calculation. 36 <br /> 37 <br />“Compaction Price Adjustment” will be calculated and paid for as described in 38 <br />Section 5-04.3(10)D3. 39 <br /> 40 <br />“Roadway Core”, per each. 41 <br /> 42 <br />The Contractor’s costs for all Work associated with the coring (e.g., traffic control) 43 <br />shall be incidental and included in the unit Bid price per each. 44 <br /> 45