My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-17 May 6, 2025 <br /> <br />1-05.11.RTF 1 <br />1-05.11 Final Inspection 2 <br /> 3 <br />Delete this section and replace it with the following: 4 <br /> 5 <br />1-05.11 Final Inspections and Operational Testing 6 <br />(October 1, 2005 APWA GSP) 7 <br /> 8 <br />1-05.11(1) Substantial Completion Date 9 <br /> 10 <br />When the Contractor considers the work to be substantially complete, the Contractor 11 <br />shall so notify the Engineer and request the Engineer establish the Substantial 12 <br />Completion Date. The Contractor’s request shall list the specific items of work that 13 <br />remain to be completed in order to reach physical completion. The Engineer will 14 <br />schedule an inspection of the work with the Contractor to determine the status of 15 <br />completion. The Engineer may also establish the Substantial Completion Date 16 <br />unilaterally. 17 <br /> 18 <br />If, after this inspection, the Engineer concurs with the Contractor that the work is 19 <br />substantially complete and ready for its intended use, the Engineer, by written notice to 20 <br />the Contractor, will set the Substantial Completion Date. If, after this inspection the 21 <br />Engineer does not consider the work substantially complete and ready for its intended 22 <br />use, the Engineer will, by written notice, so notify the Contractor giving the reasons 23 <br />therefor. 24 <br /> 25 <br />Upon receipt of written notice concurring in or denying substantial completion, whichever 26 <br />is applicable, the Contractor shall pursue vigorously, diligently and without unauthorized 27 <br />interruption, the work necessary to reach Substantial and Physical Completion. The 28 <br />Contractor shall provide the Engineer with a revised schedule indicating when the 29 <br />Contractor expects to reach substantial and physical completion of the work. 30 <br /> 31 <br />The above process shall be repeated until the Engineer establishes the Substantial 32 <br />Completion Date and the Contractor considers the work physically complete and ready for 33 <br />final inspection. 34 <br /> 35 <br />1-05.11(2) Final Inspection and Physical Completion Date 36 <br /> 37 <br />When the Contractor considers the work physically complete and ready for final 38 <br />inspection, the Contractor by written notice, shall request the Engineer to schedule a 39 <br />final inspection. The Engineer will set a date for final inspection. The Engineer and the 40 <br />Contractor will then make a final inspection and the Engineer will notify the Contractor in 41 <br />writing of all particulars in which the final inspection reveals the work incomplete or 42 <br />unacceptable. The Contractor shall immediately take such corrective measures as are 43 <br />necessary to remedy the listed deficiencies. Corrective work shall be pursued vigorously, 44 <br />diligently, and without interruption until physical completion of the listed deficiencies. This 45 <br />process will continue until the Engineer is satisfied the listed deficiencies have been 46 <br />corrected. 47 <br /> 48 <br />If action to correct the listed deficiencies is not initiated within 7 days after receipt of the 49 <br />written notice listing the deficiencies, the Engineer may, upon written notice to the 50 <br />Contractor, take whatever steps are necessary to correct those deficiencies pursuant to 51 <br />Section 1-05.7. 52
The URL can be used to link to this page
Your browser does not support the video tag.