My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-19 May 6, 2025 <br /> <br />f1-05.14.OPT1.docx 1 <br />(March 13, 1995) 2 <br />Other Contracts Or Other Work 3 <br />It is anticipated that the following work adjacent to or within the limits of this project will 4 <br />be performed by others during the course of this project and will require coordination of 5 <br />the work: 6 <br /> 7 <br />*** none anticipated *** 8 <br /> 9 <br />1-05.15.RTF 10 <br />1-05.15 Method of Serving Notices 11 <br />(January 4, 2024 APWA GSP) 12 <br /> 13 <br />Revise the second paragraph to read: 14 <br /> 15 <br />All correspondence from the Contractor shall be served and directed to the Engineer. 16 <br />All correspondence from the Contractor constituting any notification, notice of protest, 17 <br />notice of dispute, or other correspondence constituting notification required to be 18 <br />furnished under the Contract, must be written in paper format, hand delivered or sent 19 <br />via certified mail delivery service with return receipt requested to the Engineer's 20 <br />office. Electronic copies such as e-mails or electronically delivered copies of 21 <br />correspondence will not constitute such notice and will not comply with the 22 <br />requirements of the Contract. 23 <br /> 24 <br />1-05.16.RTF 25 <br />Add the following new section: 26 <br /> 27 <br />1-05.16 Water and Power 28 <br />(October 1, 2005 APWA GSP) 29 <br /> 30 <br />The Contractor shall make necessary arrangements, and shall bear the costs for power 31 <br />and water necessary for the performance of the work, unless the contract includes power 32 <br />and water as a pay item. 33 <br /> 34 <br />1-06.GR1 35 <br />Control of Material 36 <br /> 37 <br />1-06.INST1.GR1 38 <br />Section 1-06 is supplemented with the following: 39 <br /> 40 <br />1-06.OPT2.GR1 41 <br />Buy America Requirements 42 <br /> 43 <br />1-06.OPT2(A).GR1 44 <br />(March 20, 2025) 45 <br />General Requirements 46 <br />In accordance with Buy America requirements contained in 23 CFR 635.410 and 2 CFR 47 <br />184, the following materials must be produced in the United States: 48 <br /> 49 <br />1. All Iron or Steel Products used in the project. This means all manufacturing 50 <br />processes, from the initial melting stage through the application of coatings, 51 <br />occurred in the United States. 52
The URL can be used to link to this page
Your browser does not support the video tag.