Laserfiche WebLink
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-19 May 6, 2025 <br /> <br />f1-05.14.OPT1.docx 1 <br />(March 13, 1995) 2 <br />Other Contracts Or Other Work 3 <br />It is anticipated that the following work adjacent to or within the limits of this project will 4 <br />be performed by others during the course of this project and will require coordination of 5 <br />the work: 6 <br /> 7 <br />*** none anticipated *** 8 <br /> 9 <br />1-05.15.RTF 10 <br />1-05.15 Method of Serving Notices 11 <br />(January 4, 2024 APWA GSP) 12 <br /> 13 <br />Revise the second paragraph to read: 14 <br /> 15 <br />All correspondence from the Contractor shall be served and directed to the Engineer. 16 <br />All correspondence from the Contractor constituting any notification, notice of protest, 17 <br />notice of dispute, or other correspondence constituting notification required to be 18 <br />furnished under the Contract, must be written in paper format, hand delivered or sent 19 <br />via certified mail delivery service with return receipt requested to the Engineer's 20 <br />office. Electronic copies such as e-mails or electronically delivered copies of 21 <br />correspondence will not constitute such notice and will not comply with the 22 <br />requirements of the Contract. 23 <br /> 24 <br />1-05.16.RTF 25 <br />Add the following new section: 26 <br /> 27 <br />1-05.16 Water and Power 28 <br />(October 1, 2005 APWA GSP) 29 <br /> 30 <br />The Contractor shall make necessary arrangements, and shall bear the costs for power 31 <br />and water necessary for the performance of the work, unless the contract includes power 32 <br />and water as a pay item. 33 <br /> 34 <br />1-06.GR1 35 <br />Control of Material 36 <br /> 37 <br />1-06.INST1.GR1 38 <br />Section 1-06 is supplemented with the following: 39 <br /> 40 <br />1-06.OPT2.GR1 41 <br />Buy America Requirements 42 <br /> 43 <br />1-06.OPT2(A).GR1 44 <br />(March 20, 2025) 45 <br />General Requirements 46 <br />In accordance with Buy America requirements contained in 23 CFR 635.410 and 2 CFR 47 <br />184, the following materials must be produced in the United States: 48 <br /> 49 <br />1. All Iron or Steel Products used in the project. This means all manufacturing 50 <br />processes, from the initial melting stage through the application of coatings, 51 <br />occurred in the United States. 52