My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-50 May 6, 2025 <br /> <br />Lane, ramp, shoulder, and roadway closures are not allowed on any of the following: 1 <br /> 2 <br />1. A holiday, 3 <br /> 4 <br />2. A holiday weekend; holidays that occur on Friday, Saturday, Sunday or 5 <br />Monday are considered a holiday weekend. A holiday weekend includes 6 <br />Saturday, Sunday, and the holiday. 7 <br /> 8 <br />3. After *** $$ 10:00pm $$ *** on the day prior to a holiday or holiday weekend, 9 <br />and 10 <br /> 11 <br />4. Before *** $$ 7:00am $$ *** on the day after the holiday or holiday weekend. 12 <br /> 13 <br />5. The two-hour period prior to and the two-hour period after the following 14 <br />special events: 15 <br /> 16 <br />*** $$ N/A $$ *** 17 <br /> 18 <br />It shall be the Contractor’s responsibility to obtain the dates and times of all 19 <br />events. 20 <br /> 21 <br />Traffic Delays 22 <br />When Automated Flagger Assistance Devices (AFADs) or flaggers are used to 23 <br />control traffic, traffic shall not be stopped for more than *** $$ 20 $$ *** minutes at 24 <br />any time. All traffic congestion shall be allowed to clear before traffic is delayed again. 25 <br /> 26 <br />If the delay becomes greater than *** $$ 20 $$ *** minutes, the Contractor shall 27 <br />immediately begin to take action to cease the operations that are causing the delays. 28 <br />If the *** $$ 20 $$ *** minute delay limit has been exceeded, as determined by the 29 <br />Engineer, the Contractor shall provide to the Engineer, a written proposal to revise 30 <br />their work operations to meet the *** $$ 20 $$ *** minute limit. This proposal shall be 31 <br />accepted by the Engineer prior to resuming any work requiring traffic control. 32 <br /> 33 <br />There shall be no delay to medical, fire, or other emergency vehicles. The Contractor 34 <br />shall alert all flaggers and personnel of this requirement. 35 <br /> 36 <br />General Restrictions 37 <br />Construction vehicles using a closed traffic lane shall travel only in the normal 38 <br />direction of traffic flow unless expressly allowed in an accepted traffic control plan. 39 <br />Construction vehicles shall be equipped with flashing or rotating amber lights. 40 <br /> 41 <br />No two consecutive on-ramps, off-ramps, or intersections shall be closed at the same 42 <br />time and only one ramp at an interchange shall be closed, unless specifically shown 43 <br />in the Plans. 44 <br /> 45 <br />Roads or ramps that are designated as part of a detour shall not be closed or 46 <br />restricted during the implementation of that detour, unless specifically shown in the 47 <br />Plans. 48 <br /> 49 <br />Controlled Access 50 <br />No special access or egress shall be allowed by the Contractor other than normal 51 <br />legal movements or as shown in the Plans. 52
The URL can be used to link to this page
Your browser does not support the video tag.