2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-56 May 6, 2025 <br /> <br /> 1 <br />1-08.4.RTF 2 <br />1-08.4 Prosecution of Work 3 <br /> 4 <br />Delete this section and replace it with the following: 5 <br /> 6 <br />1-08.4 Notice to Proceed and Prosecution of Work 7 <br />(July 23, 2015 APWA GSP) 8 <br /> 9 <br />Notice to Proceed will be given after the contract has been executed and the contract 10 <br />bond and evidence of insurance have been approved and filed by the Contracting 11 <br />Agency. The Contractor shall not commence with the work until the Notice to Proceed 12 <br />has been given by the Engineer. The Contractor shall commence construction activities 13 <br />on the project site within ten days of the Notice to Proceed Date, unless otherwise 14 <br />approved in writing. The Contractor shall diligently pursue the work to the physical 15 <br />completion date within the time specified in the contract. Voluntary shutdown or slowing 16 <br />of operations by the Contractor shall not relieve the Contractor of the responsibility to 17 <br />complete the work within the time(s) specified in the contract. 18 <br /> 19 <br />When shown in the Plans, the first order of work shall be the installation of high visibility 20 <br />fencing to delineate all areas for protection or restoration, as described in the Contract. 21 <br />Installation of high visibility fencing adjacent to the roadway shall occur after the 22 <br />placement of all necessary signs and traffic control devices in accordance with 1-10.1(2). 23 <br />Upon construction of the fencing, the Contractor shall request the Engineer to inspect the 24 <br />fence. No other work shall be performed on the site until the Contracting Agency has 25 <br />accepted the installation of high visibility fencing, as described in the Contract. 26 <br /> 27 <br />1-08.5.GR1 28 <br />Time for Completion 29 <br /> 30 <br />1-08.5.INST2.GR1 31 <br />Section 1-08.5 is supplemented with the following: 32 <br /> 33 <br />F1-08.5.OPT7.FR1.docx 34 <br />(March 13, 1995) 35 <br /> 36 <br />This project shall be physically completed within *** thirty-five (35) *** working days. 37 <br /> 38 <br />1-08.5.OptionA.RTF 39 <br />1-08.5 Time for Completion 40 <br />(November 25, 2024 APWA GSP, Option A) 41 <br /> 42 <br />Revise the third and fourth paragraphs to read: 43 <br /> 44 <br />Contract time shall begin on the first working day following the Notice to Proceed Date. 45 <br /> 46 <br />Each working day shall be charged to the contract as it occurs, until the contract work is 47 <br />physically complete. If substantial completion has been granted and all the authorized 48 <br />working days have been used, charging of working days will cease. Each week the 49 <br />Engineer will provide the Contractor a statement that shows the number of working days: 50 <br />(1) charged to the contract the week before; (2) specified for the physical completion of 51 <br />the contract; and (3) remaining for the physical completion of the contract. The statement 52