Laserfiche WebLink
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-57 May 6, 2025 <br /> <br />will also show the nonworking days and all partial or whole days the Engineer declares 1 <br />as unworkable The statement will be identified as a Written Determination by the 2 <br />Engineer. If the Contractor does not agree with the Written Determination of working 3 <br />days, the Contractor shall pursue the protest procedures in accordance with Section 1-4 <br />04.5. By failing to follow the procedures of Section 1-04.5, the Contractor shall be 5 <br />deemed as having accepted the statement as correct. If the Contractor is approved to 6 <br />work 10 hours a day and 4 days a week (a 4-10 schedule) and the fifth day of the week 7 <br />in which a 4-10 shift is worked would ordinarily be charged as a working day then the 8 <br />fifth day of that week will be charged as a working day whether or not the Contractor 9 <br />works on that day. 10 <br /> 11 <br />Revise the sixth paragraph to read: 12 <br /> 13 <br />The Engineer will give the Contractor written notice of the completion date of the contract 14 <br />after all the Contractor’s obligations under the contract have been performed by the 15 <br />Contractor. The following events must occur before the Completion Date can be 16 <br />established: 17 <br />1. The physical work on the project must be complete; and 18 <br />2. The Contractor must furnish all documentation required by the contract and required 19 <br />by law, to allow the Contracting Agency to process final acceptance of the contract. 20 <br />The following documents must be received by the Project Engineer prior to 21 <br />establishing a completion date: 22 <br /> a. Certified Payrolls (per Section 1-07.9(5)). 23 <br /> b. Material Acceptance Certification Documents 24 <br /> c. Monthly Reports in DMCS of the amounts paid including the final payment 25 <br />confirmation to all firms required by Section 1-08.1(7)A if applicable 26 <br /> d. Final Contract Voucher Certification 27 <br /> e. Copies of the approved “Affidavit of Prevailing Wages Paid” for the Contractor 28 <br />and all Subcontractors 29 <br />f. A copy of the Notice of Termination sent to the Washington State Department of 30 <br />Ecology (Ecology); the elapse of 30 calendar days from the date of receipt of the 31 <br />Notice of Termination by Ecology; and no rejection of the Notice of Termination 32 <br />by Ecology. This requirement will not apply if the Construction Stormwater 33 <br />General Permit is transferred back to the Contracting Agency in accordance with 34 <br />Section 8-01.3(16). 35 <br /> g. Property owner releases per Section 1-07.24 36 <br /> 37 <br />F1-08.9.OptionA.rtf.docx 38 <br />1-08.9 Liquidated Damages 39 <br />(March 3, 2021 APWA GSP, Option A) 40 <br /> 41 <br />Replace Section 1-08.9 with the following: 42 <br /> 43 <br />Time is of the essence of the Contract. Delays inconvenience the traveling public, 44 <br />obstruct traffic, interfere with and delay commerce, and increase risk to Highway users. 45 <br />Delays also cost tax payers undue sums of money, adding time needed for 46 <br />administration, engineering, inspection, and supervision. 47 <br /> 48 <br />Accordingly, the Contractor agrees: 49 <br /> 50