My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-57 May 6, 2025 <br /> <br />will also show the nonworking days and all partial or whole days the Engineer declares 1 <br />as unworkable The statement will be identified as a Written Determination by the 2 <br />Engineer. If the Contractor does not agree with the Written Determination of working 3 <br />days, the Contractor shall pursue the protest procedures in accordance with Section 1-4 <br />04.5. By failing to follow the procedures of Section 1-04.5, the Contractor shall be 5 <br />deemed as having accepted the statement as correct. If the Contractor is approved to 6 <br />work 10 hours a day and 4 days a week (a 4-10 schedule) and the fifth day of the week 7 <br />in which a 4-10 shift is worked would ordinarily be charged as a working day then the 8 <br />fifth day of that week will be charged as a working day whether or not the Contractor 9 <br />works on that day. 10 <br /> 11 <br />Revise the sixth paragraph to read: 12 <br /> 13 <br />The Engineer will give the Contractor written notice of the completion date of the contract 14 <br />after all the Contractor’s obligations under the contract have been performed by the 15 <br />Contractor. The following events must occur before the Completion Date can be 16 <br />established: 17 <br />1. The physical work on the project must be complete; and 18 <br />2. The Contractor must furnish all documentation required by the contract and required 19 <br />by law, to allow the Contracting Agency to process final acceptance of the contract. 20 <br />The following documents must be received by the Project Engineer prior to 21 <br />establishing a completion date: 22 <br /> a. Certified Payrolls (per Section 1-07.9(5)). 23 <br /> b. Material Acceptance Certification Documents 24 <br /> c. Monthly Reports in DMCS of the amounts paid including the final payment 25 <br />confirmation to all firms required by Section 1-08.1(7)A if applicable 26 <br /> d. Final Contract Voucher Certification 27 <br /> e. Copies of the approved “Affidavit of Prevailing Wages Paid” for the Contractor 28 <br />and all Subcontractors 29 <br />f. A copy of the Notice of Termination sent to the Washington State Department of 30 <br />Ecology (Ecology); the elapse of 30 calendar days from the date of receipt of the 31 <br />Notice of Termination by Ecology; and no rejection of the Notice of Termination 32 <br />by Ecology. This requirement will not apply if the Construction Stormwater 33 <br />General Permit is transferred back to the Contracting Agency in accordance with 34 <br />Section 8-01.3(16). 35 <br /> g. Property owner releases per Section 1-07.24 36 <br /> 37 <br />F1-08.9.OptionA.rtf.docx 38 <br />1-08.9 Liquidated Damages 39 <br />(March 3, 2021 APWA GSP, Option A) 40 <br /> 41 <br />Replace Section 1-08.9 with the following: 42 <br /> 43 <br />Time is of the essence of the Contract. Delays inconvenience the traveling public, 44 <br />obstruct traffic, interfere with and delay commerce, and increase risk to Highway users. 45 <br />Delays also cost tax payers undue sums of money, adding time needed for 46 <br />administration, engineering, inspection, and supervision. 47 <br /> 48 <br />Accordingly, the Contractor agrees: 49 <br /> 50
The URL can be used to link to this page
Your browser does not support the video tag.