Laserfiche WebLink
Panera Bread Stormwater Management Report Everett,WA <br /> The following new development and redevelopment shall also comply with Minimum <br /> Requirements#7 through#9 for the new impervious surfaces and the converted pervious <br /> surfaces: <br /> • Creates or adds 5,000 square feet or more of new impervious surfaces, (NO) <br /> • Converts 3/4 acres, or more, of native vegetation to lawn or landscaped areas, or (NO) <br /> • Converts 2.5 acres, or more, of native vegetation to pasture. (NO) <br /> This project is exempt from Minimum Requirements#7 through#9 <br /> 2.1.2 Additional Requirements for Redevelopment Sites <br /> For redevelopment projects that disturb an acre or more of land, or that are part of a larger <br /> common plan of development or sale that disturbs an acre or more of land,the following <br /> additional requirements apply: <br /> • Redevelopment projects shall comply with all the Minimum Requirements for the new <br /> and replaced impervious surfaces if the total of the new plus replaced impervious <br /> surface is 5,000 square feet or more and the valuation of the proposed improvements— <br /> including interior improvements—exceeds 50%of the assessed value of the existing site <br /> improvements. <br /> This project does not disturb more than 1 acre of land and is not part of a larger common plan <br /> of development,therefore NO addition requirements apply. <br /> Summary: <br /> The following Minimum Requirements are required for this project and are addressed within <br /> the subsequent Stormwater Site Plan: <br /> • Minimum Requirement#1: Stormwater Site Plan <br /> • Minimum Requirement#2: Construction Stormwater Pollution Prevention Plan <br /> • Minimum Requirement#3: Source Control of Pollution <br /> • Minimum Requirement#4: Preservation of Natural Drainage Systems and Outfalls <br /> • Minimum Requirement#5: On-Site Stormwater Management <br /> • Minimum Requirement#6: Runoff Treatment <br /> Core States Group Page 10 <br />