My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
304 SE EVERETT MALL WAY PANERA BREAD Geotech Report 2025-07-25
>
Address Records
>
SE EVERETT MALL WAY
>
304
>
PANERA BREAD
>
Geotech Report
>
304 SE EVERETT MALL WAY PANERA BREAD Geotech Report 2025-07-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2025 1:22:09 PM
Creation date
7/25/2025 1:20:38 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
304
Tenant Name
PANERA BREAD
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix B <br /> Page B.1 <br /> APPENDIX B <br /> EARTHWORK SPECIFICATIONS <br /> GENERAL <br /> When the text of the report conflicts with the general specifications in this appendix, the <br /> recommendations in the report have precedence. <br /> SCOPE OF WORK: These specifications and applicable plans pertain to and include all earthwork <br /> associated with the site rough grading, including but not limited to the furnishing of all labor,tools, and <br /> equipment necessary for site clearing and grubbing, stripping, preparation of foundation materials for <br /> receiving fill,excavation,processing,placement and compaction of fill and backfill materials to the lines <br /> and grades shown on the project grading plans,and disposal of excess materials. <br /> PERFORMANCE: The Contractor shall be responsible for the satisfactory completion of all earthwork <br /> in accordance with the project plans and specifications. This work shall be inspected and tested by a <br /> representative of Krazan and Associates, Inc., hereinafter known as the Geotechnical Engineer and/or <br /> Testing Agency. Attainment of design grades when achieved shall be certified to by the project Civil <br /> Engineer. Both the Geotechnical Engineer and Civil Engineer are the Owner's representatives. If the <br /> contractor should fail to meet the technical or design requirements embodied in this document and on the <br /> applicable plans, he shall make the necessary readjustments until all work is deemed satisfactory as <br /> determined by both the Geotechnical Engineer and Civil Engineer. No deviation from these <br /> specifications shall be made except upon written approval of the Geotechnical Engineer, Civil Engineer <br /> or project Architect. <br /> No earthwork shall be performed without the physical presence or approval of the Geotechnical <br /> Engineer. The Contractor shall notify the Geotechnical Engineer at least 2 working days prior to the <br /> commencement of any aspect of the site earthwork. <br /> The Contractor agrees that he shall assume sole and complete responsibility for job site conditions <br /> during the course of construction of this project, including safety of all persons and property; that this <br /> requirement shall apply continuously and not be limited to normal working hours; and that the <br /> Contractor shall defend, indemnify and hold the Owner and the Engineers harmless from any and all <br /> liability, real or alleged, in connection with the performance of work on this project, except for liability <br /> arising from the sole negligence of the Owner of the Engineers. <br /> TECHNICAL REQUIREMENTS: All compacted materials shall be densified to a density not less <br /> than 95 percent of maximum dry density as determined by ASTM Test Method D1557 as specified in <br /> the technical portion of the Geotechnical Engineering Report. The results of these tests and compliance <br /> with these specifications shall be the basis upon which satisfactory completion of work will be judged by <br /> the Geotechnical Engineer. <br /> SOIL AND FOUNDATION CONDITIONS: The Contractor is presumed to have visited the site and <br /> to have familiarized himself with existing site conditions and the contents of the data presented in the <br /> soil report. <br /> The Contractor shall make his own interpretation of the data contained in said report, and the Contractor <br /> shall not be relieved of liability under the contractor for any loss sustained as a result of any variance <br /> Krazan and Associates,Inc. <br /> Eleven Offices Serving The Western United States <br />
The URL can be used to link to this page
Your browser does not support the video tag.