My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
200 W MARINE VIEW DR BAYWOOD Geotech Report 2025-08-11
>
Address Records
>
W MARINE VIEW DR
>
200
>
BAYWOOD
>
Geotech Report
>
200 W MARINE VIEW DR BAYWOOD Geotech Report 2025-08-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2025 11:40:28 AM
Creation date
8/11/2025 11:37:26 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
200
Tenant Name
BAYWOOD
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
111 October 16,2020 <br /> Project No. T-8221 <br /> The results of the analysis indicate that lateral displacement towards the Snohomish River channel approaching one <br /> to two inches is possible to a horizontal distance of about 120 feet from the crest of the shoreline. In our opinion, <br /> this amount of displacement would not structurally impair the building but could result in damage of a cosmetic <br /> nature similar to the liquefaction induced settlements. <br /> ' Seismic Site Class <br /> Based on the soil conditions encountered and the local geology and because the buildings natural frequency is .5 <br /> ' seconds or less,the 2015 International Building Code(IBC)indicates that site class"D"should be used in structural <br /> design. <br /> 5.0 DISCUSSION AND RECOMMENDATIONS <br /> 5.1 General <br /> Based on our study, in our opinion, development of the site as proposed is feasible from a geotechnical engineering <br /> standpoint. The existing fills at the site consist mostly of silty sand and sand soils with varying amounts of gravel <br /> and minor amounts of organics and construction debris. CPT data noted the fill to be in a medium dense to dense <br /> condition in most site areas and, in its current condition, appears suitable for support of new fill, pavements, or <br /> building elements. Some areas showed the fill to be in a loose condition,which will require removal to a minimum <br /> ' depth of two feet below base-of-footing elevation and replacing with compacted structural fill. The need for <br /> overexcavation will require confirmation by geotechnical observation and testing at the time of grading as outlined <br /> in the following Site Preparation and Grading Section. The existing fill and underlying native soils are moisture <br /> sensitive and close moisture control will be required to facilitate structural compaction of the soils if used as fill <br /> from site excavations. <br /> Detailed recommendations regarding these issues and other geotechnical design considerations are provided in the <br /> following sections. These recommendations should be incorporated into the final design drawings and construction <br /> specifications. <br /> 5.2 Site Preparation and Grading <br /> To prepare the site for construction existing vegetation should be cleared and removed from the site. Once cleared <br /> and grubbed, in the building area where three-to three-and one-half feet of fill will be required to achieve finished <br /> ' floor grade, the upper sparse grass and moss should be tilled into the sand fills and recompacted to structural fill <br /> requirements outlined below. In the pavement areas, where grades will be near existing, this upper organic layer <br /> should be stripped and removed. Stripping depth of two inches and less would be expected to remove this upper <br /> vegetative mat. <br /> ' Page No.4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.