of any public emergency declared by the mayor or city council,an additional extension of one year <br /> may be granted. <br /> VI. INFORMATION FOR DEVELOPER: <br /> PLANNING DIVISION COMMENTS—Grace Pollard—425.257.8731-GPolJard@euerettwa.gov <br /> 1. Impact Fees.Impact fees are not subject to the vested rights doctrine,the fees actually paid by the <br /> developer will be the fees in effect at the time of building permit issuance,regardless of any <br /> preliminary determination. <br /> 2. Underground utilities.All divisions of land shall have all necessary power lines,telephone wires, <br /> television cables,fire alarm systems and other communication wires,cables or lines placed in an <br /> underground location either by direct burial or by means of conduit or ducts.All such underground <br /> installations or systems shall be approved by the appropriate utility company and shall adhere to all <br /> governing applicable regulations including,but not limited to,the city and state applicable <br /> regulations and specific requirements of the appropriate utility(EMC 19.26.110). <br /> 3. Required Landscaping for Single-Family Residences.On each new lot created for single-family <br /> residences,all portions of lots which are not developed with buildings,parking area,and uses,shall <br /> be landscaped to Type IV standards. <br /> ENGINEERING/PS COMMENTS—Andrew Huang—425.257.8976—AHuang@everettwa.gov <br /> A review of this project by the Engineering/Permit Services Division indicates that the following <br /> conditions shall be met: <br /> 1. Construction permits,inspections and final approvals are required for this project from City of <br /> Everett Permit Services. <br /> 2. The construction plans must be designed from a site survey performed by a licensed State of <br /> Washington land surveyor. <br /> 3. Temporary erosion and sedimentation control(TESC)measures for construction activity must be <br /> operational prior to commencement of any clearing or earthwork.An approved permit and SWPPP <br /> for this work is required prior to set-up of TESC measures on-site.All BMPs must comply with City <br /> of Everett Design and Construction Standards and Specifications for Development. <br /> 4. All exposed ground must be reseeded within 30 days of the completion of construction.If <br /> reseeding is not practical due to weather or seasonal restraints,the ground must be covered with <br /> mulch as directed by the City Engineer. <br /> 5. City streets are to be kept clear of dirt and debris at all times during construction.Dust suppression <br /> and street cleaning must occur as directed by the Public Works Inspector. <br /> MIN <br /> Page 8of2 <br /> SS20-002 <br /> EVERETT <br />