My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc. 8/18/2025
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HDR Engineering, Inc. 8/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 1:31:21 PM
Creation date
8/20/2025 1:30:44 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc.
Approval Date
8/18/2025
Council Approval Date
8/13/2025
End Date
12/31/2027
Department
Public Works
Department Project Manager
Shaun Bridge
Subject / Project Title
Stormwater Impervious Surface Study
Tracking Number
0004943
Total Compensation
$132,595.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />Project Fees <br />Introduction <br />This section of the proposal discusses the overall fee estimate for the City’s comprehensive rate <br />study and associated tasks. Our estimated project fees have been developed based on our <br />proposed scope of work. <br />Project Fee Estimate <br />The estimated project fees were developed based upon the previously discussed scope of work. <br />For each task, the labor hours, by individual, was developed. The total labor hours were then <br />applied to the current hourly billing rates for each individual. For the proposed study, the <br />following hourly billing rates were used to establish the proposed fees for this study. These <br />hourly billing rates will be in effect through December 31, 2025. After December 31, 2025, billing <br />rates will be adjusted annually to reflect salary changes. If billing rates are adjusted for annual <br />salary adjustment the contract totals will remain the same. <br /> Individual Project Role Hourly Rate <br /> Kevin Lorentzen Project Manager $265.00/hour <br /> Shawn Koorn Project Principal 335.00/hour <br /> Jack Adams Financial Analyst 140.00/hour <br /> Josiah Close Senior Financial Analyst 225.00/hour <br /> Sara Anderson Financial Analyst 140.00/hour <br /> Various Engineering Assistance 180.00/hour <br /> Others Project Administrative/Clerical Support 140.00/hour <br />The billing rates shown above cover payroll cost, employee benefits, and HDR <br />overhead and profit. <br />In-House Expenses: <br />Vehicle Mileage Current Federal Travel Regulation (FTR) <br />Black/white Photocopies (per copy) $0.05 to $0.09 <br />Color Copies (per copy) $0.15 to $0.30 <br />Direct Expenses: <br />No markup on expenses. Other direct expenses (parking, mileage, meals, airfare, <br />etc.) will be billed at cost. <br />Based on the hourly billing rates, and the previously developed scope of services, provided <br />below is a summary of the estimated fees for the services discussed above. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.