Laserfiche WebLink
<br /> <br />2025 TDP – FINAL DRAFT 24 <br /> <br /> <br />PLAN CONSISTENCY <br />Everett Transit’s Transportation Development Plan is consistent with and supported by the City of Everett’s <br />Comprehensive Plan which is adopted by the City Council. Consistency between Everett Transit and the City of <br />Everett’s comprehensive plan policies are demonstrated on multiple levels. Some of these shared goals include <br />multi-modal connections at Everett Station, accessibility to bicyclists on Everett Transit buses, bicycle lockers, <br />and the continued integration of land use and transportation planning. <br /> <br />Projects are first programmed into the City of Everett’s Transportation Improvement Program and presented to <br />City Council. <br /> <br />Everett Transit is a member of the Seattle/Everett/Tacoma Urbanized Area (UZA) and as such falls under the <br />metropolitan planning organization, the Puget Sound Regional Council (PSRC). Under the guidance of PSRC, <br />grant funded projects are programmed into the State Transportation Improvement Program (STIP). For each <br />project, STIP applications indicate the section of the comprehensive plan that supports it. <br /> <br />Planning and coordination efforts with regional transportation partners are facilitated at PSRC’s Transit <br />Operator’s Committee (TOC) and the Regional Project Evaluation Committee (RPEC). Transit partners in the <br />region work very closely with one another to achieve integration of services. <br /> <br />Specific coordination projects include the ongoing study of a consolidated system with Community Transit and <br />coordination of design. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />