My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE 2022 PORT OF EVERETT Plans 2025-09-11 (2)
>
Address Records
>
FEDERAL AVE
>
2600
>
PORT OF EVERETT
>
Plans
>
2600 FEDERAL AVE 2022 PORT OF EVERETT Plans 2025-09-11 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2025 8:45:28 AM
Creation date
9/11/2025 8:44:47 AM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Tenant Name
PORT OF EVERETT
Permit
B2201-015
Year
2022
Notes
MODULAR BREAKROOM BUILDING WITH ACCESS RAMPS
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QA 12 Y4 B PACKAGE sSPW'HIGH EFFICIENCY WALL MOUNT HEAT PUMP - SCHEDULE <br /> I � <br /> DD FAN SENSIBLE HEATING HEAT CONNECTION <br /> BLOWER BLOWIER EFFICIENCY VENTIL OOCLING COOLING CAPACITY HEATING HEAT STRIPS <br /> TAME UNIT YODEL BARDNUF®ER 5� OTY TYPE UNIT UNIT MOTOR 'U CFH SETTEJG RFLOW SPEED eLHOP� ( C DEV7CE VENTIL (6M TYPE fFR (DB FILTER WKELP (DB)'IEMNP (WBw)lE]IPBTERING N� TUt CAPACITY 4B711�1He 4 COPUNIT 1R11T 57R8'S W1PI1T MCA MOW LINK <br /> e1y� HERTZ VGLTS PHASE KW L11UH AMPS AMPS WGT ADDITIONAL N016 <br /> O HP-1 WI8H8-AD4ZP4XXR 1.5 1 ECM 709 No 1/3 - ECON MERV-8 11.30 95 80 87 15.136 14,290 ie,B00 15 e0 240 1 OB 27.304 57 80 325 1.2,3,4,48.7.9,10,11 <br /> 1 I <br /> ADDITIONAL NOTES SEQUENCE OF OPERATION: <br /> 1-CAPACITY LISTED ABOVE ARE IN ACCORDANCE WITH ANS/ARM STANDARD 300-2003 FOR SPW(SINGLE PACKAGE VERTICAL UNITS) <br /> 2-COMPLIES WITH EFFICIENCY REOUIRENENTS OF ANSI ASI-RAE/1ESNA 90.1-201& <br /> 3-SAID THERMOSTAT�e4o�080.7-DAY PROGRAMMABLE 1-UPON A COOLING CALL FROM THE ROOM THERMOSTAT THE UNIT WILL BE IN ECONOMIZER qi MECHANICAL <br /> 4-BARD INDOOR REZ�GIE SENSOR.A8403-087 COOLING MODE OR BOTH DEPENDING ON THE ECONOMIZER JADE CONTROLLER SETPOINTS. <br /> 5-BARD 002 SENSOR'SM3-087 2-UPON A HEATING CALL FROM THE ROOM THERMOSTAT THE UNIT WILL BE IN MECHANICAL HEATING AND THE <br /> 4-r PLEATED FILTER MERV-8 ECONOMIZER WILL BE DISABLE,2ND STAGE HEAT STRIPS WILL COME ON IF THE ROOM TEMPERATURE DROPS <br /> 5-UNIT COLOR IS'BUCKEYE(RAY- BELOW ITS SETPOINT AND DURING DEFROST. <br /> 8-HEAT STRPS NIT WITH CIRCUIT BREAKER 3-CO2 SENSOR TO CONTROL THE VENTILATION MODE THROUGH THE OCCUPY CONNECTION AS REQUIRED BY ITS <br /> 7-PRE INSTALLED OUTDOOR THERMOSTAT,SET AT 40DEIS 3 LAC CONTROL(R)OPT SET POINTS10-ECONOMM.WITH JADE CONTROLLER ENTHAPY/TEMP SENSOR <br /> PLENUM VA R I F I CAT I O N 11-MBSDRMER-TO ALLAOOVIDE A MEANS OF SHUTTING DOWN OF THE MECHANICAL HEATING AND AND COOLING SYSTEM.WA DOOR SWITCH ,-THESE MODES WITH KEEP REPEATING AND REQUIRED BY THE THERMOSTAT. <br /> MC To REAR TONSTALUl1GM TIISiMICTIGS FED STAIR UP Aso ECOIPMFNT sr. <br /> M. TO OECK SITE VOLTAGE AND SST ccw=TAP ON TRANgOEER. <br /> M.0 TO SET A PROGRAM THERMOSTAT PER OISTOERS IEalIfE1IXIS <br /> MC TO SET AND GEL1G EOONOICIER AND 140411LATION PIE PRGECT PEQUI Elm/R <br /> SCALE:1/2"=1'-0" <br /> O O <br /> PLENUM #PWR139 <br /> O <br /> ---- 10 1.5 TON 4 kW <br /> MECHANICAL NOTES: - WALL HUNG <br /> 1------- S- HEAT PUMP <br /> WA - 2018 IMC WAC AND 2015 WSEC "1020 CFM MAX <br /> 1. VENTILATION PROVIDED VIA NATURAL VENTILATION IN ACCORDANCE WITH IMC SECTION 402 IN S <br /> LIEU OF DOAS REQUIREMENTS. [WSEC SECTION C 403.3.5 EXCEPTION 1] S 8 <br /> 2. MECHANICAL EQUIPMENT INSTALLATION IN OR ON THIS BUILDING SHALL BE IN ACCORDANCE WITH <br /> THE REQUIREMENTS OF IMC WAC CHAPTER 6 UNLESS OTHERWISE EXEMPTED. <br /> 3. DUCT MATERIAL IS 26 GA. GALVANIZED WITH 2.2"FSK INSULATION. DUCTWORK SHALL BE <br /> SUPPORTED. [IMC WAC SECTION 603] Q PLENUM #PWS052 <br /> 4. ROUND FLEX DUCT SHALL BE UL LISTED CLASS 1, STANDARD 181 - FACTORY MADE AIR <br /> DUCTSAND AIR CONNECTORS.THE MINIMUM THERMAL PERFORMANCE SHALL BE AT R-6, AND O <br /> MEASURED IN ACCORDANCE WITH ATSM C 518 OR ATSM C 177 AT 75DEG F MEAN <br /> TEMPERATURE. INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION <br /> INSTRUCTIONS.IN MECHANICAL PLAN- <br /> DEVELOPMENT <br /> 5. MATERIAUAL IN DUCTS SHALL HAVE A FLAME SPREAD INDEX DF LESS THAN 25, SMOKE <br /> OF 50. [IMC SECTION 602] <br /> SCALE:1!4"=1'-0" <br /> 6. LOW PRESSURE DUCT SYSTEMS SHALL HAVE LONGITUDINAL AND TRANSVERSE JOINTS, SEAMS <br /> AND CONNECTIONS OF SUPPLY AND RETURN DUCTS AND PLENUMS SECURELY FASTENED AND <br /> SEALED WITH WELDS, GASKETS, MASTICS (ADHESIVES), MASTIC-PLUS EMBEDDED-FABRIC MECHANICAL SYMBOLS <br /> SYSTEMS OR APPROVED TAPES INSTALLED IN ACCORDANCE WITH IMC WAC SECTION 603.9. <br /> 7. DUCT INSULATION SHALL COMPLY WITH IMC WAC SEC 504. SYMBOL DESCRIPTION <br /> 8. WHEN ISOLATION SLEEVES ARE USED AT LINE CONNECTIONS TO PLENUMS, THEY SHALL COMPLY ® 2'x2' SUPPLY AIR DIFFUSER <br /> WITH IMC WAC CHAPTER 6. <br /> 9. IF DIFFUSERS HAVE NO MANUAL DAMPERS, USE FLOW CONTROL AT WYES. TYPICAL AS NOTED ON TYPICAL DOOR SWITCH WITH 2'x2' RETURN AIR GRILLE <br /> PLAN. TIME DELAY WIRING FOR HEAT PUMPS <br /> 10. MINIMUM OUTSIDE AIR VENTILATION PER IMC WAC TABLE 403.3.1.1. THIS DRAWING IS SHOWN WRH A JUMPER WIRE <br /> INSTATED ON TERMINALS 01 TO n'DOOR -X- SUPPLY DUCT w/DIAMETER INDICATOR <br /> 11. OUTSIDE AIR DAMPERS SHALL COMPLY WITH WSEC, SECTION C403.7.8. SNITCH JUMPER'WRE.REMOVE JUMPER WHEN <br /> DOOR SW RCH IS INSTATED.WIRED AS SHOWN. <br /> 12. ALL NEW SYSTEMS REQUIRE ECONOMIZERS UNLESS EXEMPTED BY EXCEPTIONS. [WSEC SECTION O THERMOSTAT <br /> 403.5] O O <br /> 13. DOOR SWITCH CONTROLS SHALL BE INSTALLED IN ACCORDANCE WITH WSEC 403.4.1.6 AT ALL r---------'"- _a <br /> DOORS THAT OPEN TO THE OUTDOORS. i R e 9443RT Natural Ventilation rates per IMC Section 402 <br /> 14. MECHANICAL DRAWINGS SHOW DUCTWORK SIZES TO BE CLEAR INSIDE DIMENSION. I r 2 WZN ®G <br /> I I room#1 name Az(sf) 4%(sf) openings check notes <br /> 15. ELECTRICIAN MUST VERIFY ALL ELECTRICAL REQUIREMENTS AND LOCATIONS. i i 3® 3® ®0 - Break Room 238 9.5 29.93 OK <br /> 16. CONTRACTOR SHALL ARRANGE ALL HVAC UNITS AND ASSOCIATED ITEMS FOR ACCESS ® N NY <br /> CLEARANCES. i i E�® <br /> 17. THERMOSTAT SCHEDULING TO BE PERFORMED ON SITE BY OTHERS. <br /> L® ®Y1 DOAS is not provided due to the exception for areas with natural ventilation under 2018 WSEC C403.3.5 Exception 1. <br /> 19. <br /> . THE ACCEPTABLE OPERATING RANGE FOR THE 240V&208V TAPS ARE:ALL HVAC EQUIPMENT LEAVES FACTORY WIRED FOR 240 VOLT OPERATION. i i EN® DH N Natural Ventilation is provided per 20181MC Section 402.1,402.2 and 402.3. <br /> 1 I <br /> T <br /> TAP RANGE FIrTD 4N 019 RB11 <br /> Section 402.1-The Natural Ventilation shall be provided through the windows and exterior doors(SEE PLAN SHEETA-1 <br /> 240 253 -216 i INSTALLED 0 O for location and sizing information). <br /> RES ADO NEW UNIT LOW VOLTAGE <br /> 208 220-187 I TERMIRIAL TERMINAL BLOCK <br /> 20.SITE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR MAKING SURE THE RIGHT TAP IS i BARD <br /> CK Section 402.2-The minimum openable area ofthese means of natural ventilation,shall meetthe 4%offloorarea <br /> CONNECTED FOR THE APPLIED SITE VOLTAGE. M7421 <br /> requirement.The exterior windows and doors provide direct natural ventilation to the spaces at the perimeterofthe <br /> 21. AIR FILTERS IN HVAC UNITS OR SYSTEMS ARE TO BE CHANGED EVERY 30 DAYS BY OTHERS ON �D- SANSWrITCHSOPE WHEN O) <br /> SITE. I �L SWRCH IS OPEN WHEN DOOR <br /> I 61N THE OPEN POSITION <br /> 22.REGISTER AIR FLOW TEST AND BALANCE OF HVAC SYSTEM TO BE PROVIDED AND PERFORMED BY - IN <br /> LS IN THE CLOSED POSRION <br /> OTHERS ON SITE WHEN REQUIRED. L----- <br /> 23.HVAC SITE CONTRACTOR IS RESPONSIBLE FOR BALANCING THE SYSTEM. BALANCING SHALL BE IN THISKIT WILL COMPLY WITH WSEC G03A.1.8 CUSTOMER APPROVAL <br /> ACCORDANCE WITH IMC WAC 403.3.1.5. <br /> ❑APPROVED <br /> ❑APPROVED EXCEPT AS NOTED PRELIMINARY <br /> El REVISE AS NOTED AND RESUBMIT <br /> APPROVED By Date NOT FOR CONSTRUCTION <br /> COP RIGHTMATER 2021, <br /> I1,THE ER INDUSTRIES, <br /> PROPERTY MOBILE BREAK ROOM for. ApproVed for COnst Job No: 20081 <br /> THISOF BLAZER INDUSTRIES,INC.AND SHALL ■■ r File Copy: <br /> TO BE OTHERS <br /> AUTHORIZED <br /> DISCLOSED 10 x 30 port of Everett - Norton Expansion <br /> TD OTHERS EXCEPT AS AUTHORIZED BY THE INDUSTRIES,INC. Drawn By: LDG I� <br /> DATE REVISION BY WRITTEN PERMISSION OF BLAZER INDUSTRIES. P.O.aox4e9 www.5lu_'ind.wm WA Pacific Mobile Everett,WA <br /> �� 99501ney St. ■ Aumsville.OR 97325-0489 Issue Date: 11-29-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.