MITHUN <br /> EvCC-Learning Resource Center Page 3 of 4 <br /> Permit Correction Letter 21-0111 <br /> On sheet T1.02, references to 2-story openings have been removed.The code analysis is <br /> updated to indicate there is a 2-story atrium at Stair 1 C on level 1 to 2 and Stair 2C on level <br /> 2 to 3.The atrium spaces are to comply with the requirements of Section 404 including <br /> 404.6, exception 1. <br /> Accordingly, the following updates to the drawings have been made: <br /> • Door schedule on sheet A0.32 has been updated to indicate doors 2C and 3C are <br /> self-closing doors. <br /> • Sheets A0.34 and A0.35 have been updated to indicate the glass frame types that <br /> surround the atriums are to comply with section 404.6 where the glass is installed <br /> within a gasketed frame in a manner that allows the framing system to deflect <br /> without breaking the glass before the sprinkler system operates.The glazing frame <br /> types (2.2, 61, 62, 63, and 64) that surrounds the level 2 atrium has been updated <br /> from an all-glass partition to a curtain wall which provides a system which the glass <br /> is installed within a gasketed frame. Additionally, a note has been added to these <br /> frame types indicating that automatic sprinklers are to be provide which wet the <br /> entire surface of glass upon activation of the sprinkler system and references sheets <br /> M5.02 and M50.3 for more information. <br /> • Sheets A2.2213 and A22313 have been updated to indicate 1-hour fire rated walls at <br /> walls surrounding the atrium that are not glass walls. Accordingly, details have been <br /> provided at various intersections between fire-rated assemblies and adjacent <br /> construction.Sheet A8.01 has been added to show plan details at the glazing to <br /> partition wall intersections at the atrium. Sheet A8.02 has been added and shows <br /> details with curtain wall frames at the atrium. Sheet A8.1 1 has been added to show <br /> section details of fire-rated assembly details, see details 1, 3, 6, 7. <br /> • General note #10 has been added to RCP sheet A2.6213 and A2.636 referencing <br /> sheets M5.02 and M5.03 regarding sprinkler requirements around atrium glass <br /> enclosure around Stair 1 C and Stair 2C.Sheets M5.02 and M5.03 have been <br /> included as reference drawings at the end of the revised drawing set to show the <br /> notes for the fire sprinklers on the fire suppression plans. <br /> Correction #5. <br /> On Sheet 1/A6.19, it appears that the handrail extensions from the bottom riser do not <br /> slope. Please revise as required to a sloping configuration. IBC 1014.6. <br /> Response: <br /> Details on sheet A6.19 have been updated to show the handrail extension continuing to <br /> slope per IBC 1014.6. Additionally, stair sections on sheets A6.15 and A6.16 have been <br /> updated to also show the continuation of the handrail slope. <br /> Correction #6. <br /> On Sheet A6.01, it appears that notes for the two-way communication system at proposed <br /> elevator appear to be missing. Please clarify or revise drawings as required. IBC 1009.8. <br /> Response: <br /> Two-way communication system had previously been indicated in the electrical plans, not <br /> submitted in the architectural permit submittal.Sheet A6.01 has now been updated to <br /> now indicate the two-way communication system on thr architectural drawings. <br /> Structural <br /> Correction #7. <br />