My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group Inc. 10/7/2025 Amendment 3
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Group Inc. 10/7/2025 Amendment 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2025 1:46:50 PM
Creation date
10/8/2025 1:46:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group Inc.
Approval Date
10/7/2025
Council Approval Date
10/1/2025
End Date
12/31/2027
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
CSO Storage at 36th St
Public Works WO Number
UP3700
Amendment/Change Order
Amendment
Amendment/Change Order Number
3
Tracking Number
0002775
Total Compensation
$1,311,609.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
September 2025 Page 4 of 8 Jacobs Engineering Group Inc. Assumptions: • See Subsection 2, “Assumptions for Amendment No. 3” in front of this document. Activities: • The Consultant will prepare construction plans and specifications incorporating changes related to the items listed in Section 3. • Update Division 00 specification sections to accommodate recent state and city policies updates. • Attended approximately 10 weekly coordination meetings with PSE to develop plan to address utility conflict. • Ongoing coordination with SnoPUD to accommodate PUD utility relocations. • The Consultant will submit final documents for bidding. Deliverables: • Deliver design coordination drawings for PSE and SnoPUD. • Four updates to Division 00 specification sections. • Drawing and specification updates to 100% design to incorporate design change for addition of ATS. • Drawing and specification updates to 100% design to incorporate design change for realigning conveyance to avoid utility conflict with PSE gas. • Drawing and specification updates to 100% design to incorporate minor design changes to accommodate SnoPUD utility relocations. Subtask 2440P – Issue for Bid Documents - Pacific Avenue The Consultant will revise the previously prepared 100 percent pre-bid review documents to the final stage of design completion, including incorporating comments and design changes from third party stakeholders. The Consultant will also continue coordination with BNSF for obtaining a temporary shoring permit. Assumptions: • See Subsection 2, “Assumptions for Amendment No. 3” in front of this document. Activities: • The consultant will prepare construction plans and specifications by incorporating changes related to the items listed in Section 3. • Updated Special Provisions to accommodate recent state and city policy updates. • Design change for casing length per WSDOT request and associated drawing updates. • Ongoing coordination with BNSF in addition to previously scoped work, including addressing BNSF pre-submittal comments
The URL can be used to link to this page
Your browser does not support the video tag.