My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9001 AIRPORT RD BLDG 4 2025-10-27
>
Address Records
>
AIRPORT RD
>
9001
>
9001 AIRPORT RD BLDG 4 2025-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 9:45:58 AM
Creation date
10/10/2025 11:53:18 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
9001
Unit
BLDG 4
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
396
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNO-ISLE TECH 2O23 SMALL WORKS <br />i McGRANAHAN ARCHITECTS <br />,Section 01 10 50, Page 1 <br />PROJECT MEETINGS <br />PROJECT MEETINGS <br />Ll <br />PART 1 <br />GENERAL <br />1.01 PRE -CONSTRUCTION MEETING <br />A. <br />Pre -Construction Meeting will be held upon notice by the District. <br />B. <br />Meeting Location: SNO-Isle Skills Center. This meeting is to review contract administration requirements and <br />mobilization procedure. <br />C. <br />Attendance is required of the following: <br />1. Owner's Representative(s); <br />2. Contractor's Superintendent, Project Engineer and Project Manager; <br />3. Major Subcontractors -(to include mechanical, electrical, sitework and others as needed/requested); <br />4. A/E representatives, and <br />5. Others, as appropriate. <br />D. <br />Architect will: <br />1. Preside, conduct meeting, and publish agenda. <br />2. Record, reproduce, and distribute copies of minutes within two business days of meeting to all meeting <br />participants. <br />E. <br />Agenda: Discussion will pertain to detailed information, such as: <br />1. Communications chain and persons authorized to direct changes; <br />2. The Work; <br />3. Work sequence, phasing, and occupancy; <br />4. Contractor use of premises; <br />5. Special project procedures; <br />6. Procedures and processing: <br />L_ 1 <br />a. Application for payments, <br />-, <br />b. Change Orders, (CO) <br />C. Requests for Information (RFI), <br />d. Field decisions, <br />e. Submittals, <br />£ Others as appropriate. <br />" <br />7. Project Record documents; <br />i <br />8. Construction facilities, controls, and construction aids; <br />9. Temporary utilities; <br />10. Security procedures; <br />a. Contractor operational procedures such as Safety and first -aid; Housekeeping procedures; Utility <br />shutdowns; Parking; and others, as appropriate. <br />b. Review Architect's Newforma InfoExchange site. <br />mcg-ARC 2120.000 February 28, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.