My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9001 AIRPORT RD BLDG 4 2025-10-27
>
Address Records
>
AIRPORT RD
>
9001
>
9001 AIRPORT RD BLDG 4 2025-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 9:45:58 AM
Creation date
10/10/2025 11:53:18 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
9001
Unit
BLDG 4
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
396
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNO-ISLE TECH 2O23 SMALL WORKS Section 0130 00, Page 7 <br />McGRANAHAN ARCHITECTS ADMINISTRATIVE REQUIREMENTS <br />2. "Provide as Noted": During review, the Architect noted deviations from the design intent expressed in the <br />contract documents. Changes or correction to eliminate those deviations have been noted on the returned <br />submittal. Contractor is to provide the submitted product or system with noted corrections <br />incorporated. No additional submittal is required. <br />3. "Revise as Noted and Resubmit": During review, the Architect noted deviations from the design intent <br />expressed in the contract documents. Changes or correction to eliminate those deviations have been noted <br />on the returned submittal. Contractor shall make corrections to submittal as noted and resubmit for <br />additional review by Architect. <br />4. "Rejected": Either submitted product or systems does not meet requirements of contract documents <br />and Contractor shall submit alternate product or system which does meet the requirements of the contract <br />documents or, the submittal is not sufficiently complete or does not sufficiently address the requirements <br />of the contract documents to allow review. <br />5. Do not permit submittals marked "Revise as Noted and Resubmit" or "Rejected" to be used at the Project <br />site, or elsewhere where Work is in progress. <br />C. Architect will return submittal by Architect Newforma InfoExchange site. <br />3.07 COLOR SELECTIONS <br />A. All samples required for color/finish selection or verification are required to be coordinated with one <br />another. Samples submitted for this purpose will be reviewed in groups as noted below to allow for <br />coordination. No samples will be reviewed until all samples for a given group have been received. Missing <br />items will delay the selection process and all delays will be responsibility of the contractor. No additional time <br />or extensions will be allowed due the delay of submitting required submittals. <br />1. Architectural interior finishes. <br />2. Electrical items and fixtures. <br />3. Mechanical items and fixtures. <br />B. Allow 14 calendar days for selection of colors by the Owner and the Architect from the date that a complete <br />selection group is received by the Architect. <br />C. Maintain a color control book on site of all approved color samples. <br />END OF SECTION <br />mcg-ARC 2120.000 February 28, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.