My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9001 AIRPORT RD BLDG 4 2025-10-27
>
Address Records
>
AIRPORT RD
>
9001
>
9001 AIRPORT RD BLDG 4 2025-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 9:45:58 AM
Creation date
10/10/2025 11:53:18 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
9001
Unit
BLDG 4
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
396
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNO-ISLE WELDING SHOP REMODEL Section 01 31 00, Page 1 <br />McGRANAHAN ARCHITECTS PROJECT COORDINATION <br />PROJECT COORDINATION <br />PART 1 GENERAL <br />1.01 SUMMARY <br />A. Section Includes: <br />1. General coordination provisions. <br />2. Requirements for coordination of space. <br />B. This Section applies to all Technical Specification Sections, and the General Conditions. <br />C. Contractor shall perform the following Project Coordination Requirements: <br />1. Coordinate the Work of all Subcontractors with the Work of the Contractor. <br />a. Distribute information and coordinate necessary action of subcontractors and suppliers in response to <br />information and direction provided by the Architect (i.e., Requests for Information, Requests for <br />Proposal, executed Change Orders, etc.). <br />b. Provide all necessary temporary utilities and facilities to maximally expedite the work. <br />C. Among the work of all of the trades. <br />d. Ensure that notification to and inspections by permitting agencies are completed in a timely manner. <br />e. Ensure that cleaning requirements are maintained in accordance with Division 1 — Cleaning. <br />2. Coordinate the schedules of all subcontractors to: <br />a. Verify timely deliveries of products for installation by other trades. <br />b. Verify that labor and materials are adequate to maintain schedules. <br />3. Conduct conferences among all subcontractors, and other concerned parties, as necessary to: <br />a. Maintain coordination and schedules. <br />b. Resolve matters in dispute. <br />C. Coordinate utility outages. <br />4. Participate in Project meetings: <br />a. As required by these specifications. <br />b. Report progress of the Work. <br />C. Recommend needed changes in schedules. <br />d. Transmit minutes of meetings to all other trades, as appropriate. <br />5. Temporary Utilities Required During Construction: <br />a. Coordinate submittals, installation, operation, and maintenance, to verify compliance with Project <br />requirements and with Contract Documents. <br />b. Verify adequacy of service at required locations. <br />6. All Required Submittals: Prior to submittal, in accordance with Division 1, review for compliance with <br />Contract Documents. The Contractor shall review and coordinate all subcontractor submittals of any tier.All <br />submittals must be submitted by the Contractor and not by others and shall be stamped, dated and signed <br />indicating General Contractor's review. <br />mcg-ARC 2120.000 February 28, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.