My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1724 100TH ST SW 2025-11-07
>
Address Records
>
100TH ST SW
>
1724
>
1724 100TH ST SW 2025-11-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2025 1:34:57 PM
Creation date
10/14/2025 10:47:29 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
1724
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Earth Solutions NWLLC <br /> 15365 NE 901h Street,Suite 100 FIELD REPORT <br /> Redmond,WA 98052 <br /> Main(425)449-4704 1 Fax(425)449-4711 <br /> www.esnw.com <br /> Project No. 9128.00 Page 1 of 1 Report ID 9128.00 E 2023 0309 <br /> Date Thu 3/9/2023 Weather Cloudy, 50°F <br /> Arrival/Departure Time(s) 12:55— 1:25 Travel Time(hr) 1.0 <br /> Project Name Dakota Way Short Plat <br /> Location SE of 100th St SW & Dakota Way, Everett <br /> ESNW Rep.&Phone Greg Buzitis, (206) 488-4151 <br /> Client Info/Contact GPA Enterprises, Inc. I Pavel Andreyanov <br /> General Contractor Info/Contact <br /> Reviewed By LAC LA2— KRC lam/ <br /> Field Supervisor Initials/Date Project Manager Initials/Date <br /> Limitations:The presence of our Feld representative at the site is to provide our client with a source of professional advice,opinions,and recommendations based upon the field representative's <br /> observations and testing of the contractor's work. Our services do not include supervision or direction of the contractor,their employees,or agents. Geotechnical recommendations for <br /> obtaining project objectives may be made by our representatives;however,direction of the actual work should come from the owner or contractor,as appropriate. The contractor is responsible <br /> for complying with the contract documents at all times,regardless of the presence of our field representative.Jobsite safety,including compliance with all applicable state or federal regulations, <br /> is the sole responsibility of the contractor. The observations,recommendations,and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. <br /> ESNW rep. was onsite to observe over-excavation operations for the lots onsite. <br /> Lot over-ex observations: <br /> Upon arrival, ESNW rep. observed the contractor has begun excavating around the site to remove the <br /> concrete rubble located onsite. While onsite, ESNW rep. spoke with the contractor and determined they <br /> will be focusing on removing the concrete rubble found buried throughout the site. ESNW rep. will be <br /> available to observe the removal of the material and observe and test any backfill that is needed in the <br /> over-excavated areas. <br /> - <br /> rC— u�.Ul:.L utiV .1 <br /> Approx. location of lot <br /> ''•` fit • ,; <br /> '-{ --- excavations <br /> i i r •� <br /> Areas where inorganic <br /> debris was observed <br /> of <br />
The URL can be used to link to this page
Your browser does not support the video tag.