My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell, Inc. 10/28/2025
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell, Inc. 10/28/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:51:32 AM
Creation date
10/29/2025 10:49:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell, Inc.
Approval Date
10/28/2025
Council Approval Date
10/22/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WPCF Headworks Replacement - Design
Tracking Number
0004998
Total Compensation
$8,998,917.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
WPCF Headworks Replacement Project Scope of Work <br />18 <br /> <br />Activities/Approach: <br /> Design and project management <br />o Administer contracts, including monthly invoicing and team coordination <br />o Attend weekly coordination meetings with the BC design team through October 2027. <br />o Participate in bi-weekly coordination meetings with the geotechnical engineer through <br />the duration of the design project. <br />o Set up and manage the project BIM model in concert with the BC design team. <br />o Complete up to five WPCF site visits as needed to inform project design. <br /> Cost estimating <br />o Support development of and review up to six cost estimates during the course of the <br />design project. PSE assumes estimates will be developed during the following project <br />milestones: alternatives analysis, basis of design, site preparation package, preliminary <br />design, intermediate design, and final design. <br />o Provide written review comments for cost estimates developed by BC. <br /> Alternatives analysis <br />o Review pertinent codes and standards to determine structural design criteria. <br />o Coordinate the conceptual headworks foundation design and seismic resiliency with <br />project geotechnical engineer. <br />o Develop structural layouts, conduct predesign analysis and evaluate potential <br />foundation options for the proposed headworks and secondary structures in support of <br />the project alternatives analysis. <br />o Develop conceptual drawings as needed to support the alternatives analysis. <br />o Prepare workshop materials for the structural focused alternatives analysis workshop, <br />including PowerPoint slides, agenda, and meeting notes. <br />o Draft structural related sections of the Alternatives Analysis Report. <br /> Basis of design <br />o Draft relevant sections of the BODR. <br />o Draft a standalone structural design criteria technical memorandum (TM) that will be <br />provided as an attachment to the report. <br />o Develop conceptual drawings and layouts of the headworks facility to supplement the <br />BODR. <br />o Attend up to three coordination meetings with the City. <br /> Site Preparation Package <br />o Prepare structural drawings and specifications for inclusion in the preliminary, final, and <br />bid document design phases for the site preparation package. <br />o Develop design documents, including drawings and specifications, for the site <br />preparation package final design submittal. <br />o Participate in two workshops associated with the site preparation package design. <br />o Assists in responding to bidder questions during the project bid period. Responses will <br />be incorporated into the site preparation package addenda. This scope of work assumes <br />up to five addenda will be issued for this construction package.
The URL can be used to link to this page
Your browser does not support the video tag.