WPCF Headworks Replacement Project Scope of Work <br />26 <br /> <br />o CPARB application materials <br />o Project Delivery Evaluation TM <br />o Geotechnical Data and Engineering Reports <br />o Alternatives Analysis Report <br />o BODR <br />Task 350 Corrosion Probe (Coatings) <br />Objective: This task reserves a space for subconsultant support for recommendations and <br />specification development for high-performance coatings. The need for sub services will be identified <br />during preliminary design and funded, as needed, through unanticipated services budget. <br />Task 360 Confluence Environmental <br />Objective: Provide environmental compliance and permitting support. This work includes site <br />reconnaissance for critical areas assessment and preparation of a Critical Areas Report, <br />identification of anticipated permits and preparation of a permit matrix, and preparation of the <br />environmental and permitting section of the BODR. Environmental Science Associates will provide a <br />cultural resources review and Watershed Science & Engineering will provide floodplain support, both <br />as subconsultants to Confluence Environmental. <br />Activities/Approach <br /> Complete site reconnaissance for critical areas assessment. <br /> Prepare Critical Areas Report. <br /> Develop a permit matrix outlining anticipated permits and associated requirements. <br /> Prepare a SEPA Environmental Checklist. <br /> Complete a Cultural Resources Assessment, including archaeological survey and reporting. <br /> Complete a floodplain evaluation using 2D modeling and review flood-related data. This work <br />will be completed as needed should new facilities be located in a designated floodway, once <br />the location of the new headworks facility has been established. <br /> Prepare flood hazard permit documents including the following: <br />o Federal Emergency Management Agency (FEMA) Conditional Letter of Map Revision <br />(CLOMR) <br />o FEMA Letter of Map Revision (LOMR) <br /> Contract setup, administration, and subconsultant project management. <br />Task Assumptions <br /> This scope of work assumes that no wetlands are anticipated for the proposed work areas. If <br />wetlands are identified within the area of work, additional scope and budget will be required. <br /> LOMR will be completed during or immediately following the project construction phase. <br />City Responsibilities <br /> Provide site access for two staff to complete the site reconnaissance for the Critical Areas <br />Assessment. <br />Meetings <br /> 1-hour kickoff meeting attended by up to two staff members <br /> Three check-in meetings attended by up to two staff members