My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell, Inc. 10/28/2025
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell, Inc. 10/28/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:51:32 AM
Creation date
10/29/2025 10:49:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell, Inc.
Approval Date
10/28/2025
Council Approval Date
10/22/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WPCF Headworks Replacement - Design
Tracking Number
0004998
Total Compensation
$8,998,917.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
WPCF Headworks Replacement Project Scope of Work <br />28 <br /> <br />City Responsibilities <br /> Attend coordination meetings <br />Meetings <br /> Two 1-hour pre-site work coordination meetings <br />Deliverables <br /> Laboratory analysis report <br /> All raw data in spreadsheet format <br />Task 380 BC Subconsultant Support <br />Objective: Coordinate subconsultant services (except Geotech sub under Task 390) throughout the <br />project basis of design phase. <br />Activities/Approach <br /> Manage services of subconsultants needed to inform predesign activities, including <br />contracting and billing. <br /> Maintain ongoing communications with the subconsultants and monitor subconsultant <br />progress related to technical execution. <br /> Review subconsultant work to provide coordination with overall project goals, standards, <br />guidelines, and deliverables. <br /> Coordinate subconsultant workshop material development. <br /> Coordinate subconsultant site visits and attend site visits to support subconsultant activities. <br /> Coordinate BC and City review of subconsultant work products. <br />Task Assumptions <br /> BC site visit attendance will be completed under Phase 100, Task 120. <br /> Subconsultant support services assume a two year design duration. <br />City Responsibilities <br /> Support subconsultant site visits as needed. <br />Meetings <br /> BC will conduct regular coordination meetings with each subconsultant. <br />Work Products <br /> Meeting notes summarizing key decisions and action items <br /> Review and comment on subconsultant work products <br /> Monthly subconsultant invoices incorporated into overall project invoices and progress <br />reports <br />Deliverables <br /> None <br />Task 390 Geotech Sub Support <br />Objective: This task provides coordination and technical support services between the BC design <br />team and the geotechnical engineering subconsultant. The objective of this task is to align <br />geotechnical investigations and deliverables with project requirements, timelines, and design
The URL can be used to link to this page
Your browser does not support the video tag.