My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Port Gardner Storage Facility - Facility Construction Package Table of Contents <br />Project No. 157889 5 <br /> <br />DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) Engineer of <br />Record <br />23 09 33 ELECTRIC AND ELECTRONIC CONTROL SYSTEMS FOR HVAC C. Biesemeyer <br />23 20 00 HVAC PIPING C. Biesemeyer <br />23 30 00 SHEET METAL DUCTWORK AND ACCESSORIES C. Biesemeyer <br />23 31 13 METAL DUCTS C. Biesemeyer <br />23 33 46 FLEXIBLE DUCTS C. Biesemeyer <br />23 34 13.13 AXIAL HVAC PROPELLER WALL FANS C. Biesemeyer <br />23 81 00 UNITARY HVAC EQUIPMENT C. Biesemeyer <br /> <br />DIVISION 26 ELECTRICAL Engineer of <br />Record <br />26 05 00 COMMON WORK RESULTS FOR ELECTRICAL D. Tucker <br />26 05 05 SELECTIVE DEMOLITION FOR ELECTRICAL D. Tucker <br />26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES D. Tucker <br />26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS D. Tucker <br />26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS D. Tucker <br />26 05 33.23 SURFACE RACEWAYS FOR ELECTRICAL SYSTEMS D. Tucker <br />26 05 36 CABLE TRAYS FOR ELECTRICAL SYSTEMS D. Tucker <br />26 05 74 ARC FLASH HAZARD ANALYSIS, SHORT CIRCUIT STUDY AND <br />PROTECTIVE DEVICE COORDINATION REPORT <br />D. Tucker <br />26 08 00 COMMISSIONING OF ELECTRICAL SYSTEMS D. Tucker <br />26 09 16 ELECTRICAL CONTROLS AND RELAYS D. Tucker <br />26 22 00 LOW-VOLTAGE TRANSFORMERS D. Tucker <br />26 24 13 SWITCHBOARDS D. Tucker <br />26 24 16 PANELBOARDS D. Tucker <br />26 24 19 MOTOR-CONTROL CENTERS D. Tucker <br />26 27 00 MINI-POWER CENTERS D. Tucker <br />26 29 23 VARIABLE FREQUENCY MOTOR CONTROLLERS D. Tucker <br />26 32 13.14 DIESEL FUEL POLISHING SYSTEM D. Tucker <br />26 36 23 AUTOMATIC TRANSFER SWITCHES D. Tucker <br />26 41 13 LIGHTNING PROTECTION FOR STRUCTURES D. Tucker <br />26 43 13 SURGE PROTECTIVE DEVICES FOR LOW-VOLTAGE ELECTRICAL <br />POWER CIRCUITS <br />D. Tucker <br />26 50 00 LIGHTING D. Tucker <br /> <br />DIVISION 27 COMMUNICATIONS Engineer of <br />Record <br />27 13 23.21 MULTI-MODE FIBER OPTIC PROCESS CONTROL NETWORKS C. Bliesner <br />27 13 23.23 SINGLE-MODE FIBER OPTIC PROCESS CONTROL NETWORKS C. Bliesner <br /> <br />DIVISION 31 EARTHWORK Engineer of <br />Record <br />31 09 11 SETTLEMENT AND VIBRATION MONITORING J. Riegel <br />31 09 16.10 DYNAMIC PILE TESTING S. Brodahl <br />31 10 00 SITE CLEARING J. Riegel <br />31 23 00 EXCAVATION AND FILL J. Riegel <br />31 23 19 DEWATERING J. Riegel
The URL can be used to link to this page
Your browser does not support the video tag.