My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Port Gardner Storage Facility - Facility Construction Package Table of Contents <br />Project No. 157889 6 <br /> <br />DIVISION 31 EARTHWORK Engineer of <br />Record <br />31 25 00 TEMPORARY EROSION AND SEDIMENTATION CONTROL J. Fu <br />31 32 23 SOIL CEMENT GROUND IMPROVEMENT A. Power <br />31 32 25 PERFORMANCE BASED MITIGATION MEASURES FOR <br />SETTLEMENT CONTROL <br />S. Brodahl <br />31 50 00 EXCAVATION SUPPORT SYSTEMS J. Riegel <br />31 62 23.13 CONCRETE-FILLED STEEL PILES G. Mazzotti <br />31 63 33 DRILLED MICROPILES G. Mazzotti <br /> <br />DIVISION 32 EXTERIOR IMPROVEMENTS Engineer of <br />Record <br />32 12 16 ASPHALT PAVING J. Fu <br />32 31 13 CHAIN LINK FENCES AND GATES J. Fu <br /> <br />DIVISION 33 UTILITIES Engineer of <br />Record <br />33 01 30.16 TV INSPECTION OF PIPELINES J. Riegel <br />33 05 13 MANHOLES AND STRUCTURES J. Riegel <br />33 05 31.11 PVC GRAVITY SEWER PIPE J. Riegel <br />33 05 36 FIBERGLASS REINFORCED UTILITY PIPE J. Riegel <br />33 32 12.02 SELF PRIMING CENTRIFUGAL PACKAGED WASTEWATER PUMP <br />STATIONS <br />M. Bray <br />33 32 16 PACKAGED PUMP STATIONS M. Bray <br />33 42 00 STORMWATER CONVEYANCE J. Fu <br />33 46 59 STORMWATER TREATMENT EQUIPMENT J. Fu <br />VOLUME 3 SPECIFICATIONS <br />DIVISION 40 PROCESS INTERCONNECTIONS Engineer of <br />Record <br />40 05 01 PIPING SYSTEMS M. Bray <br />40 05 02 PIPING SYSTEM SCHEDULES M. Bray <br />40 05 02.23 POTABLE WATER M. Bray <br />40 05 02.29 PLANT UTILITY WATER, MEDIUM PRESSURE M. Bray <br />40 05 02.43 PRESSURIZED WASTEWATER AND DRAINAGE M. Bray <br />40 05 02.61 FUEL TRANSFER M. Bray <br />40 05 02.81 ODOR CONTROL C. Biesemeyer <br />40 05 02.89 BUILDING MECHANICAL DRAINAGE C. Biesemeyer <br />40 05 06 SPECIALTY COUPLINGS AND ADAPTERS FOR PROCESS PIPING C. Biesemeyer <br />40 05 07 HANGERS AND SUPPORTS FOR PROCESS PIPING C. Biesemeyer <br />40 05 07.13 SEISMIC RESTRAINTS FOR PIPING C. Biesemeyer <br />40 05 07.14 SETTLEMENT/SEISMIC PROVISIONS FOR YARD PIPING J. Riegel <br />40 05 17 COPPER PROCESS PIPE AND TUBING C. Biesemeyer <br />40 05 19 DUCTILE IRON PIPE C. Biesemeyer <br />40 05 23 STAINLESS STEEL PROCESS PIPE AND TUBING C. Biesemeyer <br />40 05 24 STEEL PIPE C. Biesemeyer <br />40 05 31.13 SOLVENT CEMENT WELDED PVC AND CPVC PRESSURE PIPE C. Biesemeyer <br />
The URL can be used to link to this page
Your browser does not support the video tag.