Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 11 00 - 7 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br />01 11 00 - 7 SUMMARY OF WORK <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />2) Process Mechanical <br />a) Routing and installation of 4-inch diameter process water piping <br />for conveyance of plant water (2W) to water cannons (item b). <br />b) Installation of three pedestal mounted pressurized water <br />cannons around the perimeter of the Area 35 basin. <br />3) Electrical <br />a) Routing power for proposed instrumentation. <br />4) Instrumentation and Controls <br />a) Installation and integration of the following Area 30 instrument <br />types into the site control system. <br />1. Radar level <br />2. Level float switches <br /> <br />8. Area 40 Stormwater Diversion and Treatment <br />a. Area 40 improvements include two primary features 1 – stormwater <br />diversion structure and 2 - stormwater treatment system. The work <br />associated with each of these items is outlined in Sections 1 and 2 <br />below. <br />1) Project work at the stormwater diversion structure includes <br />converting the existing 40-foot diameter gravity thickener to an <br />above grade vault for housing 48-inch and 18-inch diameter <br />stormwater piping. These modifications include structural, process <br />mechanical, instrumentation and controls, and site civil work. <br />a) Structural <br />1. Structural work includes selective demolition of the gravity <br />thickener to create penetrations for the 48-inch diameter and <br />18-inch diameter stormwater pipes to pass through the <br />thickener walls. Additional demolition is required to create an <br />opening in the structure for a raised stairway providing <br />access to the vault. <br />2. Installation of two new pile supports within the diversion <br />structure. <br />3. Installation of pipe supports for the 48-inch and 18-inch <br />diameter stormwater pipelines. <br />4. Installation of stairways for vault ingress and egress and <br />within the vault for accessing all areas within the structure. <br />5. Modification of the diversion structure drain by raising the <br />existing pipe to the new floor level, filling the center sump <br />with concrete, and connecting the existing drainpipe to the <br />new site stormwater drain. <br />6. Connecting the existing drain (#4 above) to the site storm <br />drain system and connecting the existing scum box drain to <br />the site storm drain system.
The URL can be used to link to this page
Your browser does not support the video tag.