My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 11 00 - 21 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br />01 11 00 - 21 SUMMARY OF WORK <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />1.10 ATTACHMENTS <br />A. The following attachments are included in Volume 7 to the Contract <br />Documents as reference documents: <br />1. Attachment A: Scott Paper Company and Kimberly-Clark As-Built <br />Drawings for Port Gardner Storage Facility Site <br />2. Attachment B: June 2023 Geotechnical Report Port Gardner Wet Weather <br />Design <br />3. Attachment C: HWA GeoSciences Inc. Concrete Coring & Lab Testing for <br />Structural Evaluation <br />4. Attachment D: Corrosion Probe, Inc. October/November 2022 Condition <br />Assessment <br />5. Attachment E: Floyd Snider Utility Property Cleanup Action Plan <br />Memorandum <br />6. Attachment F: Terracon Consultants, Inc. Regulated Building Materials <br />Assessment <br />7. Attachment G: City of Everett Sold Waste Facility Permit # PT0005247 <br />(SW-393) <br />8. Attachment H: Prevailing Wage Form <br />9. Attachment I: Port Gardner Storage Facility Temporary Electrical System <br />10. Attachment J: 1000 kVA Diesel Engine Driven Generator Set <br />Manufacturer’s Information and Requirements. <br />11. Attachment K: Draft Stormwater Pollution Prevention Plan <br />12. Attachment L: Inadvertent Discovery Plan <br />13. Attachment M: 2019 Boundary Line Adjustment of Former Kimberly-Clark <br />Worldwide, Inc. <br />14. Attachment N: Alternative Staging Areas <br />END OF SECTION 01 11 00
The URL can be used to link to this page
Your browser does not support the video tag.