Laserfiche WebLink
City of Everett 00 21 13 - 8 <br />Port Gardner Storage Facility - Facility Construction Package WO# UP-3525 <br /> <br /> <br />00 21 13 - 8 INSTRUCTIONS TO BIDDERS <br />Bid security shall serve as evidence of good faith and as a guarantee that if awarded the <br />Contract the Bidder will execute the Contract (which includes execution of the PLA letter <br />of assent) and provide bonds and evidence of insurance as required by the Bid. Should <br />the successful Bidder fail to enter into the Contract, furnish satisfactory performance and <br />payment bonds, and furnish evidence of insurance on the date(s) required by in bidding <br />documents, the certified check, cashier’s check or bid bond shall be forfeited as liquidated <br />damages. <br />1-02.8 Not Used. <br />1-02.9 Delivery of Bid <br />Bidder shall submit Bidder’s Bid in a sealed opaque envelope that clearly and legibly <br />notes the Project Name, the time and date of the bid opening, and the Bidder’s name <br />and address on the outside of the envelope. <br />The City will not open or consider any Bid or any supplement to a Bid that is received <br />after the time specified for receipt of Bids, or received in a location other than that <br />specified for receipt of Bids. <br />1-02.10 Withdrawing, Revising, or Supplementing Bid <br />After submitting a physical Bid Form to the City, the Bidder may withdraw, revise, or <br />supplement it if: <br />1. The Bidder submits a written request signed by an authorized person and <br />physically delivers it to the place designated for receipt of Bids, and <br />2. The City receives the request before the time set for receipt of Bids, and <br />3. The revised or supplemented Bid (if any) is received by the City before the <br />time set for receipt of the Bid. <br />The original physical Bid Form may be supplemented, or revised and resubmitted as the <br />official Bid if the City receives it before the time set for receipt of Bids. <br />Email, fax or telephone requests to withdraw, revise, or supplement a Bid are not <br />acceptable. <br />Resubmitted Bids shall be in full compliance with the bidding requirements. Bid deposit <br />shall be in an amount sufficient for the Bid as resubmitted. <br />After the scheduled time for opening Bids, no Bidder will be permitted to withdraw its Bid <br />unless the award of contract is delayed for a period exceeding 45 calendar days. <br />Proposals received after the scheduled closing for opening Proposals will be returned <br />unopened to the Bidder.