My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
INSTRUMENTATION & CONTROL <br />PLC PANEL POWER DISTRIBUTION <br />CONNECTION DIAGRAM <br />Y-00-4002 <br />488 <br />C. BLIESNER <br />D. JACKSON <br />L. LUBKE <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />WO# UP-3525 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />500RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PATH/FILENAME: C:\Users\DJackson\AppData\Local\Autodesk\AutoCAD Plant 3D\CollaborationCache\97190 - Port Gardener\PID DWG\Y-00-4002.dwgLAST UPDATE: August 14, 2025 @ 12:27:58 pmPLOT DATE: August 14, 2025 @ 12:29:46 pm12/2/2024 ZB 09/03/2025 ZB <br />CB-X <br />L N <br />G <br />20A <br />CB-X <br />CB-X <br />HEATER <br />L <br />120 VAC <br />FROM POWER DISTRIBUTION PANEL <br />N G <br />AC POWER <br />AVAILABLE <br />HEATER <br />L N <br />G <br />PANEL LIGHT <br />WITH SWITCH <br />NXX <br />NXX <br />NXX <br />CB-X <br />NXX <br /> <br />F COOLING FAN <br />CB-X <br />NXX SPARE <br /> <br />CR <br />XX <br />SPD <br />3A <br />CB-X <br />120 VAC RECEPTACLENXX <br />CB-X L <br />G <br />24 VDC <br />POWER <br />SUPPLY <br />N <br />-+ <br />NXX <br />24 VDC UPS <br />-+ <br />-+ <br />-+ <br />24 VDC UPS <br />BATTERY <br />-+ <br />+- <br />OPERATOR <br />INTERFACE <br />TERMINAL <br />+- <br />G <br />+- <br />NETWORK <br />SWITCH <br />FUXX <br />XXA <br />FUXX <br />XXA <br />FUXX <br />XXA <br />24V- <br />24V- <br />24V- <br />OIT <br />PLC PANEL <br />NETWORK <br />SWITCH 1 <br />+- <br />IN-24 VDC <br />FUXX <br />XXA <br />24V-24 VDC NEC CLASS 2 <br />OUTPUT <br />OUT-24 VDC+- <br />24 VDC UPS <br />CONTINUED <br />TOP RIGHT+- <br />NETWORK <br />SWITCH <br />PLC PANEL <br />NETWORK <br />SWITCH 2 <br />+- <br />RACK 00 <br />BASE UNIT <br />DISCRETE INPUT MODULES <br />SEE DWG Y-00-5005 <br />FUXX <br />XXA <br />FUXX <br />XXA <br />FUXX <br />XXA <br />24V- <br />24V- <br />24V- <br />FUXX <br />XXA <br />24V- <br />RACK 00 <br />POWER <br />DISCRETE INPUT <br />MODULES <br />FUXX <br />XXA <br />24V- <br />FUXX <br />XXA <br />24V- <br />+- <br />24 VDC UPS <br />FROM BELOW <br />LEFT <br />+- <br />RACK 01 <br />BASE UNIT <br />FUXX <br />XXA <br />24V- <br />RACK 01 <br />POWER <br />DISCRETE OUTPUT MODULES <br />SEE DWG Y-00-5005 <br />DISCRETE OUTPUT <br />MODULES <br />ANALOG INPUT/OUTPUT MODULES <br />SEE DWG Y-00-5004 <br />ANALOG <br />INPUT/OUTPUT <br />MODULES <br />FUXX <br />XXA <br />24V- <br />+- <br />00 <br />05 <br />10 <br />15 <br />20 <br />25 <br />30 <br />35 <br />40 <br />45 <br />50 <br />55 <br />60 <br />65 <br />70 <br />75 <br />80 <br />85 <br />90 <br />95 <br />100 <br />110 <br />GENERAL NOTES <br />KEYNOTES <br />1.THIS DRAWING IS GENERAL IN NATURE AND DEPICTS <br />GENERAL POWER DISTRIBUTION FOR THE APPLICABLE <br />CONTROL PANEL. <br />2.PROVIDE EXTERNAL WIRE NUMBERS PER SECTION 26 05 00. <br />PROVIDE INTERNAL WIRE NUMBERS PER SECTION 40 67 00. <br />3.ON THE POWER DISTRIBUTION DRAWING(S), PROVIDE EACH <br />CIRCUIT BREAKER (CB) AND FUSE (FU) WITH A UNIQUE ID <br />NUMBER AND IDENTIFY AN AMP RATING, IF NOT SHOWN. <br />4.POWER DISTRIBUTION WIRING SHOWN AS TYPICAL FOR <br />EACH TYPE OF I/O MODULE. PROVIDE I/O MODULES <br />ACCORDING TO RACK LAYOUT FOR PLC PANEL SHOWN ON <br />Y-00-4001. <br />1 REFER TO ELECTRICAL DRAWINGS FOR PLC PANEL 120 <br />VAC POWER SOURCE <br />2 PROVIDE NEC CLASS 2 POWER SUPPLY WHEN REQUIRED <br />BY PRODUCT MANUFACTURER <br />3 PROVIDE RIO RACK WITH ETHERNET BASE CONTROLLER <br />AND ADDITIONAL DIGITAL AND ANALOG MODULES <br />ACCORDING TO SECTION 40 61 93A I/O SCHEDULE <br />4 PROVIDE FUSE FOR EACH I/O MODULE <br />1 <br />2 <br />3 <br />4 <br />4 <br />4 <br />24V- <br />TO SCADA <br />COMMUNICATIONS PANEL <br />SEE DWG Y-00-4007 <br />CB-X <br />105 <br />10-FSH-4000 <br />10-FSH-4100 <br />25-FSH-4200 <br />FIRE AND YARD HYDRANT <br />SYSTEM BACKFLOW <br />PREVENTER 1 FLOOD SWITCH <br />FIRE AND YARD HYDRANT <br />SYSTEM BACKFLOW <br />PREVENTER 2 FLOOD SWITCH <br />WASHDOWN SYSTEM <br />BACKFLOW PREVENTER <br />FLOOD SWITCH <br />FUXX <br />XXA <br />24V- <br />FUXX <br />XXA <br />24V- <br />FUXX <br />XXA <br />24V- <br />115 <br />125 <br />120 <br />SPARE <br />SPARE <br />SPARE
The URL can be used to link to this page
Your browser does not support the video tag.