My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
5'-2"4'-0" <br />3'-8"4'-8"INSTRUMENTATION & CONTROL <br />TYPICAL RIO PANEL <br />LAYOUT DRAWING <br />Y-00-4003 <br />489 <br />C. BLIESNER <br />D. JACKSON <br />L. LUBKE <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />WO# UP-3525 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />500RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PATH/FILENAME: C:\Users\DJackson\AppData\Local\Autodesk\AutoCAD Plant 3D\CollaborationCache\97190 - Port Gardener\PID DWG\Y-00-4003.dwgLAST UPDATE: August 14, 2025 @ 12:36:02 pmPLOT DATE: August 14, 2025 @ 12:48:50 pm12/2/2024 ZB 09/03/2025 ZB <br />21SLOT:023451SLOT:60 <br />ETHERNET BASECONTROLLER MODULECPU <br />DISCRETE INPUT16-CHANNELDISCRETE OUTPUT8-CHANNELDISCRETE OUTPUT8-CHANNEL30 <br />NPX <br />12 <br />8 <br />28 <br />18 <br />19 <br />17 <br />16 <br />24 <br />31 <br />RIO BILL OF MATERIALS <br />ITEM NO.DESCRIPTION QUANTITY <br />1 DL205 BASE UNIT A/R <br />2 ETHERNET BASE CONTROLLER MODULE A/R <br />3 16 CHANNEL DIGITAL INPUT MODULE A/R <br />4 8 CHANNEL DIGITAL OUTPUT MODULE A/R <br />5 8 CHANNEL/4 CHANNEL ANALOG <br />INPUT/OUTPUT MODULE A/R <br />6 NOT USED N/A <br />7 12" OPERATOR INTERFACE TERMINAL 1 <br />2 3 4 51SLOT:0 <br />SCS-PG-20-RIO-7000 <br />RIO RACK 00 LAYOUTETHERNET BASECONTROLLER MODULESPARECPU <br />DISCRETE INPUT16-CHANNELDISCRETE OUTPUT8-CHANNELANALOG INPUT/OUTPUT8-CHANNEL/4-CHANNELDISCRETE INPUT16-CHANNELCPU <br />SCS-PG-60-RIO-7000 <br />RIO RACK 01 LAYOUT SPAREANALOG INPUT/OUTPUT8-CHANNEL/4-CHANNELANALOG INPUT/OUTPUT8-CHANNEL/4-CHANNELETHERNET BASECONTROLLER MODULESCS-PG-60-RIO-7000 <br />RIO RACK 00 LAYOUT DISCRETE OUTPUT8-CHANNELDISCRETE INPUT16-CHANNELDISCRETE INPUT16-CHANNELDISCRETE INPUT16-CHANNEL7 <br />29 <br />13 <br />21 <br />16 <br />23 <br />24 <br />23 <br />11 <br />23 <br />10 <br />SCALE: NTS <br />B BACK PANEL LAYOUT <br />GENERAL NOTES <br />KEYNOTES <br />1.THIS DRAWING IS GENERAL IN NATURE AND DEPICTS <br />GENERAL PANEL LAYOUT AND FABRICATION <br />REQUIREMENTS FOR THE APPLICABLE CONTROL PANEL. <br />FABRICATE PANEL IN ACCORDANCE WITH SECTIONS 40 67 00 <br />AND 40 63 43. <br />2.CONTROL PANEL SHALL MEET THE REQUIREMENTS OF UL <br />508A. <br />1 BILL OF MATERIALS LISTS MAIN PLC/RIO COMPONENTS <br />FOR TYPICAL PANEL. REFER TO SECTION 40 63 43 FOR <br />DETAILS AND ACCESSORIES <br />2 UPS BATTERIES TO BE PHYSICALLY SECURED TO PANEL <br />WHILE STILL ALLOWING ACCESS/REMOVAL FOR <br />MAINTENANCE. ENCLOSURE HAS BOTTOM CONDUIT <br />ENTRIES. UPS TO BE MOUNTED ON FEET/STANDS TO NOT <br />INTERFERE WITH CONDUIT ENTRIES <br />3 COORDINATE COOLING FAN AND LOUVER LOCATION ON <br />PANEL WITH PANEL INSTALLATION LOCATION TO PREVENT <br />BLOCKING BY ADJACENT PANELS <br />PANEL BILL OF MATERIALS <br />ITEM NO.DESCRIPTION QUANTITY <br />8 NEMA 4X ENCLOSURE 1 <br />9 BACK PANEL 1 <br />10 SURGE PROTECTION DEVICE A/R <br />11 CONTROL RELAY A/R <br />12 PANEL LIGHT 1 <br />13 THERMOSTAT 1 <br />14 HEATER 1 <br />15 120 VAC RECEPTACLE 1 <br />16 24 VDC POWER SUPPLY 1 <br />17 24 VDC UPS 1 <br />18 24 VDC UPS BATTERY 1 <br />19 DC TO DC CONVERTER, NEC CLASS 2 <br />OUTPUT A/R <br />20 MODBUS TCP/IP GATEWAY A/R <br />21 MANAGED NETWORK SWITCH 1 <br />22 CIRCUIT BREAKER A/R <br />23 TERMINAL BLOCK A/R <br />24 FUSED TERMINAL BLOCK A/R <br />25 GROUND BAR A/R <br />26 WIREWAY (SIZE AS REQUIRED)A/R <br />27 DIN RAIL, 35 MM A/R <br />28 NEMA 4X EXHAUST FAN 1 <br />29 NEMA 4X LOUVER 1 <br />30 ENCLOSURE DOOR SWITCH 2 <br />31 DO MORE H2 RIO KEY NOTE 1 <br />32 NEMA 4X OIT COVER 1 <br />2 3 3 4 5 525523333444 <br />3 <br />2 <br />1 <br />32 <br />10 <br />22 <br />11 <br />23 <br />15 <br />20 <br />23 <br />24 <br />24 <br />SCALE: NTS <br />A ENCLOSURE EXTERIOR <br />RACK 00 RACK 01 <br />3 <br />NAMEPLATE SCHEDULE <br />NPX LINE 1 LINE 2 LINE 3 <br />NP1 SCS-PG-20-PNL-7000 DEBRIS REMOVAL RIO PANEL <br />NP3 SCS-PG-60-PNL-7000 EFFLUENT PUMP STATION RIO PANEL <br />7 <br />SPARE6 <br />SPARE7 <br />SPARE14 <br />BASE UNIT1 <br />BASE UNIT1 <br />BASE UNIT1 <br />ANALOG INPUT/OUTPUT8-CHANNEL/4-CHANNEL
The URL can be used to link to this page
Your browser does not support the video tag.