Laserfiche WebLink
Aa Ab Ac Ba Bb Bc <br />1 <br />P-25-3001 <br />1 <br />P-25-3002 <br />SEE CIVIL SHEETS FOR <br />CONTINUATION <br />1 <br />D13006 <br />A B <br />8 <br />7 <br />C <br />8" 1W <br />1" 1W <br />8" 1W <br />1" 1W UP TO RPBP <br />8" 1W UP TO RPBP <br />4 <br />P-25-3002 <br />NEW TRENCH DRAIN <br />BELOW GRATE <br />3 <br />1 <br />P-25-3001 <br />1 <br />P-25-3002 <br />8" 1W <br />8" 2W <br />6" SD <br />6" SD <br />6" SD <br />6" SD <br />6" SD <br />6" SD <br />6" SD 6" SD <br />6" SD <br />6" SD <br />6" SD <br />2 <br />1" 2W <br />1" 2W <br />1" 1W <br />3 <br />4 <br />5 <br />4 4 <br />5 <br />4 <br />5 <br />5 <br />4 <br />5 <br />5 <br />7D13006 <br />6" SD 8 <br />84" SD <br />7 <br />7 <br />D13006 <br />D13006 <br />HEAT TRACE THERMOSTAT 3 <br />KEY PLAN <br />SCALE: NTS <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />C49625ARTERBIESE <br />M <br />EEYRPLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/P-3525-20-25-30V23.rvt8/27/2025 8:20:57 AMP-25-1001 <br />379 <br />PLUMBING <br />INFLUENT BUILDING UPPER AND LOWER <br />PLANS <br />C. BIESEMEYER <br />J. CONAWAY <br />R. LONG <br />KEYNOTES: <br />1 VALVE PER 40 05 02.89, TYPICAL 5 INSTANCES. INSTALL <br />BUTTERFLY VALVE WITH SHAFT ORIENTED HORIZONTAL, <br />PER 40 05 60. JOIN VALVE TO EXISTING FLANGE. FIELD <br />VERIFY EXISTING FLANGE DIMENSIONS AND COORDINATE <br />WITH ADJACENT VALVE CONFIGURATION. <br />2 PROVIDE NEW ROOF DRAINS, REPRESENTATIVE DRAINS <br />ARE SHOWN - COORDINATE LOCATION WITH <br />ARCHITECTURAL SHEETS. HORIZONTAL/VERTICAL ROOF <br />DRAIN PIPE SHALL BE INSULATED, SLOPE MINIMUM 2%, <br />AND HAVE MINIMUM 6" DIAMETER. <br />3 INSULATE AND HEAT TRACE 1" 1W&2W AND 8" 1W&2W <br />PIPE. PROVIDE TSTAT CONTROLLER AND MIN CABLE <br />RATING 3.0 W/FT. PROVIDE ACCESSIBLE HEAT TRACE <br />THERMOSTAT ASSEMBLY. FIELD COORDINATE <br />THERMOSTAT INSTALLATION PER MANUFACTURER <br />REQUIREMENTS WITH EXISTING HANDRAIL AND <br />FEATURES ON THE ROOF. <br />4 SD - STORMDRAIN PIPE USED FOR PRIMARY ROOF DRAIN <br />SYSTEM SHALL BE PIPED AND INSTALLED PER LOCAL <br />PLUMBING CODES, INCLUDING DISTINCT DISCHARGE <br />FROM OVERFLOW DRAIN SYSTEMS. <br />5 SD - STORMDRAIN PIPE USED FOR OVERFLOW ROOF <br />DRAIN SYSTEM SHALL BE PIPED AND INSTALLED PER <br />LOCAL PLUMBING CODES, INCLUDING DISTINCT <br />DISCHARGE FROM PRIMARY DRAIN SYSTEMS. <br />7 DOWNSPOUT NOZZLE, ZURN Z199 OR EQUAL. INSTALL <br />PER MANUFACTURER REQUIREMENTS. <br />8 SD - STORMDRAIN PIPE USED FOR RPBP DRAIN SYSTEM <br />SHALL BE PIPED AND INSTALLED PER LOCAL PLUMBING <br />CODES. THE RPBP SYSTEM SHALL TIE INTO THE SD <br />SYSTEM THAT DISCHARGES TO THE PRIMARY BASINS, <br />SEE NOTE 7. <br />SCALE: 3/16" = 1'-0" <br />INFLUENT STORAGE BUILDING LOWER LEVEL1 <br />SCALE: 3/16" = 1'-0" <br />INFLUENT BUILDING PIPING PLAN UPPER LEVEL2