My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Addendum 1 Page 11 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />$ 1,000,000 Personal & Advertising Injury <br />$ 1,000,000 Each Occurrence <br />$ 100,000 Fire Damage <br />• Pollution Liability policy from 15.3.14.7 shall provide at least <br />$1,000,000 per occurrence coverage for Bodily Injury and Property <br />Damage. <br />All other insurance requirements remain unchanged.” <br />Item 13 - SPECIFICATION 00 73 00 SPECIAL CONDITIONS: <br />Delete Section 4.2.A.2 and Replace with the following: <br />“2. As approved by Owner’s Representative.” <br />Item 14 - SPECIFICATION 01 11 00 SUMMARY OF WORK: <br />Delete Paragraph 1.1.2.a and Replace with the following: <br />“a. The site work includes installation of various diameter combined sewer, <br />stormwater manholes and conveyance lines, plant water lines (including <br />meters and vaults, backflow prevention device and hot box, fire <br />suppression main and hydrants, water distribution lines for the OMES <br />building (Area 70) and numerous yard hydrants, geotechnical <br />improvements, and buried electrical including duct banks. In some <br />instances, new pipeline installations include integration with existing <br />structures or buried pipelines. The Area 10 site work also includes <br />installation of the Conveyance Drain Pump Station.” <br />Item 15 - SPECIFICATION 01 11 00 SUMMARY OF WORK: <br />Delete Paragraph 1.1.2.b and Replace with the following: <br />“b. Above grade improvements include construction of access roads, parking <br />areas, site paving, fencing, and Conveyance Drain Pump Station. <br />1) The scope of work for the construction of the Conveyance Drain <br />Pump Station includes procurement and installation of a vendor <br />supplied package pump station and associated piping and <br />appurtenances. The pump station will consist of two self-priming <br />centrifugal pumps (duty/standby) within a pre-fabricated FRP <br />building. This pump station will drain residual water left within the 42- <br />inch diameter CO18 pipeline and secondary storage low points <br />following completion of the plant’s automatic draining sequence.
The URL can be used to link to this page
Your browser does not support the video tag.