My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Addendum 1 Page 12 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />2) The Conveyance Drain Pump Station will be installed along the <br />southeast wall of Area 35 Stormwater Equalization. The pump station <br />draws from a 16-inch diameter line connected to the 42-inch diameter <br />CO18 conveyance pipeline east of CSMH 15-01. The suction lines <br />then reduce to 6-inch diameter before entering the pump station. The <br />pumps will discharge through a buried 6-inch diameter forcemain <br />conveying flow to the vault located at the northwest corner of Area 30 <br />Primary Storage.” <br />Item 16 - SPECIFICATION 01 11 00 SUMMARY OF WORK: <br />Delete first sentence of Paragraph 1.10.A and Replace with the following: <br />“A. The following attachments are included in Volume 7 of the Facility <br />Construction Package as reference documents:” <br />Item 17 - SPECIFICATION 01 11 00 SUMMARY OF WORK: <br />Delete Paragraph 1.10.A.2 and Replace with the following: <br />“2. Attachment B: May 2025 Geotechnical Report Port Gardner Wet <br />Weather Design” <br />Item 18 - SPECIFICATION 01 11 00 SUMMARY OF WORK: <br />Add new Paragraph 5 under 1.5.C: <br />“5. City of Everett Utility Connection permits shall be applied for separately by <br />the Contractor performing the work. Permits must be obtained for the <br />following items: <br />o Utility permit for 6” compound meter and water main tap. <br />o Utility permit for 8” compound meter and water main tap. <br />o Utility permit for dual Reduced Pressure Backflow Assemblies in the <br />backflow preventer fiberglass building. <br />o Utility permit for premise backflow protection on OMES building. <br />o Utility permit for sanitary sewer connection to OMES. This will include both <br />the cut and cap of the existing side sewer and the new 4” connection.” <br />Item 19 - SPECIFICATION TABLE OF CONTENTS <br />Add new Division 33 Specification under DIVISION 33 UTILITIES: <br />“33 01 30.50 BYPASSING AND DEWATERING”
The URL can be used to link to this page
Your browser does not support the video tag.